Order the records the way the system is learned

Jochen asked whether the order made sense. It did not -- it followed when
things happened to be decided, which after consolidation is fictional anyway
since record 5 alone folds decisions taken across a week.

Concretely wrong before: the domain statement sat at 8, after five engineering
rules; the constitution was scattered across 5, 12 and 17; the tiers landed at
15, 16, 21 and 22 with process records in between.

Now it walks: what the mesh is (1-3), its tiers from the bottom up (4-8), what
runs on them and how it gets there (9-10), how it is built (11-16), how it is
checked (17-18), how we work (19-23).

Two things made this safe rather than free. It is a permutation, not a
compaction, so the renames go through temporary names -- otherwise two files
want one slot and one is lost. And the reference rewrite is a single
simultaneous pass, because almost every number moved into a slot another number
was vacating; replacing one at a time would have cascaded and pointed things at
the wrong record while still resolving.

Verified: 284 [ADR NNNN](path) links across the repository, all with matching
text and target.

The ordering principle is now stated in 19 rather than left implicit -- the
repository already said "the numbering is the flow" about its folders, and
there was no reason for the records to be the exception.
This commit is contained in:
2026-08-28 23:30:42 +02:00
parent e1febe8e0f
commit 333356cff3
85 changed files with 471 additions and 465 deletions
+3 -3
View File
@@ -19,8 +19,8 @@ indistinguishable from one that cannot.
|---|---|---|
| `links` | every relative link resolves | — (run ad hoc during authoring; now permanent) |
| `rests-on` | `decisions:` and `extends:` name records that exist and are **accepted** | the class behind both incidents |
| `live-citation` | a governing document citing a **superseded** record names its replacement in the same paragraph | `01-to-be/README.md` citing ADR 0017 as live guidance |
| `supersession` | if A says it was superseded by B, B says it supersedes A | ADR 0010 never declared that it superseded 0011 |
| `live-citation` | a governing document citing a **superseded** record names its replacement in the same paragraph | `01-to-be/README.md` citing ADR 0022 as live guidance |
| `supersession` | if A says it was superseded by B, B says it supersedes A | ADR 0012 never declared that it superseded 0011 |
| `numbering` | the number in the filename is the number in the heading | — |
## What is deliberately not checked
@@ -31,7 +31,7 @@ indistinguishable from one that cannot.
having it.
- **`03-DESIGN/00-as-is/` may rest on a superseded record.** It describes what runs, and what
runs was built under whatever was decided at the time
([ADR 0021](../../02-DECISIONS/0021-the-substrate-and-the-control-plane.md):
([ADR 0006](../../02-DECISIONS/0006-the-substrate-and-the-control-plane.md):
*as-is describing a superseded decision is exactly what as-is is for*).
- **Whether a citation's prose is still true.** Only whether the record it points at is live.
A document can cite an accepted record and describe it wrongly, and nothing here notices.