diff --git a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md index 8f8ad940..72f2e16a 100644 --- a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md +++ b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md @@ -673,3 +673,4 @@ Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again | The pipeline runner's fix for the re-pin livelock (row 153) took two review rounds: the first found the placed-again steps' ask ids equal to the ids the runner had just dropped (the build node refuses a dropped id; the work queue dedupes the composition's; a restart found none of them), and a kept mover placed later reading the branch's held view instead of its kept revision. H-A-286 settled both (every ask id of a kept mover carries its kept revision; its entry and pins are read at that revision wherever it is placed or pin-checked), and H-A-287 aligned the rule of one validate: a pipeline has one validate run, which a kept mover's own validate ask joins. Approved at the second round and merged at 18:01 into a pipeline of its own, with its hand pack for the control-node built beside it; merges are held again from then (rows 112 and 153); the pipeline runner (`mesh-delivery-pipeline`). Owed: the runner's unplaced line for a kept mover whose revision is not yet readable. | H1 (the fix); H2 (the line) | | While the re-pin fix (row 154) was built, the pipeline carrying the tool runner (row 151) ended at 17:45 could-not-run: its build ask on the build seat had no word from its holder within the silent bound of forty-five minutes (row 118), because the tool runner's build at that pipeline's fingerprint had been withdrawn by the re-pins' newer builds before it could answer; the tool runner then rode the newest re-pin revision's pipeline, nine of them waiting in the queue; the fixed runner, placed on the control-node by hand at about 18:05, keeps it there from now on. The builder meanwhile says the tool runner's release 0.1.55 is queued at the distribution already, while the registry holds nothing of it; the distribution's word is being read (rows 111, 151 and 153); the pipeline runner (`mesh-delivery-pipeline`), the builder and the artifact registry. | H1 | | The re-pin fix (row 154) was placed on the control-node by hand at 18:05, and the pipeline runner started clean; but the pipeline of row 155 still held the slot: every one of its movers had left to newer pipelines and its last open step had ended could-not-run at 17:45, yet it counted as running, with nine pipelines waiting behind it. The lead cancelled it at 18:09, the second pipeline of this kind to hold the slot with nothing left to do (row 112 was the first) (rows 112, 154 and 155); the pipeline runner (`mesh-delivery-pipeline`). Settled by H-A-288 (a pipeline ends, and the next is placed, the moment nothing of it is open: at the last mover's leave, at the last open step's end in any outcome, and at the runner's start pass), in build in the runner. | H1 | +| The cause of row 156's held slot, read from the pipeline runner's code and the control-node's journal: the pipeline did judge its end at 17:45, but never wrote it; the runner computed every mover's widens inside the end's compare-and-set loop (126 movers, each asking the seat mesh-grants and cut after five seconds, about eleven minutes per try) while the pipeline's key kept changing under it, so every write was refused and the reads were made again (212 cuts between 17:45 and 18:05) until the restart, and the start pass judged no ends (rows 112 and 156); the pipeline runner (`mesh-delivery-pipeline`). Settled by H-A-289 (the reads an end needs are made once before the compare-and-set and shared by every mover and every retry; a retry reads only the key again), beside H-A-288's end pass at the start; in build in the runner. Owed: the five-second cut of the seat mesh-grants's answer itself (rows 69 and 115). | H1 |