Playbooks 07 and 08: integration tests only in the merge check, no try before it, no lab and no end-to-end tests yet (the operator, 2026-10-16)
mesh/merge-gate out of date: judged against trunk c22b58143b74, the trunk is now b9af4e373dc0; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk c22b58143b74, the trunk is now b9af4e373dc0; judged again on a recheck or when it is merged
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate out of date: judged against trunk c22b58143b74, the trunk is now b9af4e373dc0; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk c22b58143b74, the trunk is now b9af4e373dc0; judged again on a recheck or when it is merged
mesh/delivery superseded: a newer head of the same pull request
This commit is contained in:
@@ -26,7 +26,7 @@ A small fix (one repository, one issue, about an hour of work) follows
|
||||
change wrong; everything else is an issue of its own.
|
||||
- **The first check after the whole branch is written.** A feature's catalogue branch, pushed once after
|
||||
hours of local work, met its first check on 2026-10-16 and failed on 29 problems, TypeScript errors among
|
||||
them, that its own check finds in minutes.
|
||||
them, that a unit suite run continuously while working finds at once.
|
||||
- **A green pull request nobody marks.** An approved, green pull request that was not marked ready waited
|
||||
12 h 17 min for someone to merge it (mesh-catalog #300, 2026-10-14).
|
||||
- **A module proven only after it reached the machines.** The mail modules were delivered with unit tests
|
||||
@@ -123,24 +123,20 @@ never into the running one, unless it blocks the running one.
|
||||
|
||||
## Phase 3 — Check (no review)
|
||||
|
||||
1. **Push every feature branch and try it before any pull request.** `mesh-controller.try` with the
|
||||
repository and the branch runs the merge check on the builder, in the check's own toolchain, never
|
||||
locally (ADR 0391 §4); a branch that fails goes back
|
||||
to its fixing agent, and nothing is opened until every branch passes. A local run never stands in for it:
|
||||
the check's containers carry other tools than the nodes.
|
||||
2. **Open one pull request per repository, together.** Pull requests in two or
|
||||
1. **Push every feature branch and open one pull request per repository, together.** The integration tests
|
||||
run only in the merge check (the operator, 2026-10-16), never before. Pull requests in two or
|
||||
more repositories that share the branch name are one delivery group (ADR 0239 §2).
|
||||
Where a session pushes through the forge tool `gitea_commit` (one commit on the forge's current base), the
|
||||
reviewer first confirms that commit's tree equals the reviewed one.
|
||||
3. **The forge's merge checks run the integration tests once** (`mesh/merge-gate`, `mesh/repo-check`). No
|
||||
2. **The forge's merge checks run the integration tests once** (`mesh/merge-gate`, `mesh/repo-check`). No
|
||||
second review: phase 2 reviewed this tree.
|
||||
4. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
||||
3. **A check that fails** goes back to the reviewer with the failure, for **one more cycle** of phase 2 with
|
||||
the same fixing agents; then push once again.
|
||||
5. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
|
||||
4. **The step's acceptance is proven before it is marked ready.** A step that adds or changes a module
|
||||
carries an integration test that starts the module whole, its process against the real bus and store, and
|
||||
shows the step's acceptance sentence; the forge's checks run it (ADR 0391 §1, §6). Unit tests alone are not
|
||||
that proof, and no lab run is (ADR 0391 §5: end to end only on the operator's ask).
|
||||
6. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
|
||||
that proof; the mesh has no end-to-end tests yet, and the lab is not used (the operator, 2026-10-16).
|
||||
5. **The reviewer marks each pull request ready as soon as the acceptance is shown** (`mesh/ready` and a
|
||||
comment `ready at <full sha>`, the head it approved); mesh-delivery merges it when its checks pass
|
||||
(ADR 0364). The operator's word is waited for only when the step changes what the operator sees, removes
|
||||
data, or needs a step only the operator's terminal can take; the lead says which before the step starts.
|
||||
@@ -246,9 +242,8 @@ issues in `fixing` that nobody works on reads to the operator as stuck work.
|
||||
review rules; `issue-tracker.list` with `flag: abandoned` lists issues left in `fixing` with nobody on them.
|
||||
- A pull request reviewed and green but not marked ready for more than 15 minutes is a lead that did not
|
||||
mark it.
|
||||
- A pull request whose head has no passing `mesh-controller.try` before it was opened, or a step that adds or
|
||||
changes a module marked ready with no integration test that starts the module whole, is
|
||||
the failure of phase 3's first and fifth steps.
|
||||
- A step that adds or changes a module marked ready with no integration test that starts the module whole is
|
||||
the failure of phase 3's fourth step.
|
||||
- A bed run from `.work/<slug>/mesh-lab` that fails naming a `.work/<slug>/<repo>/…` path it cannot find is a
|
||||
missing sibling worktree, not a mesh fault.
|
||||
|
||||
|
||||
@@ -35,17 +35,14 @@ one delivery**. Everything before the push is local and fast.
|
||||
done-when is opened as an issue of its own, never asked as a change). The reviewer's findings go back to the same agent that wrote the fix, continued by
|
||||
its id, so the fix keeps its context. A playbook or design edit of a few lines may skip the reviewer: the
|
||||
operator's word on the pull request is its review, and the lead marks it ready on that word.
|
||||
5. **Push the branch, try it, then open the pull request.** `mesh-controller.try` with the repository and the
|
||||
branch runs the merge check in the check's own toolchain before any status is set; open the pull request
|
||||
only once it passes. A local run never stands in for it: the check's containers carry other tools than the
|
||||
nodes (a test that called util-linux `flock -E` passed on a node and failed on BusyBox's in the check). The
|
||||
forge's merge checks run the integration tests. A failed check
|
||||
5. **Push once and open the pull request.** The forge's merge check runs the integration tests, the only
|
||||
place they run (the operator, 2026-10-16). A failed check
|
||||
goes back to the same agent with the failure, and the reviewer reads only the change it makes.
|
||||
6. **The reviewer marks it ready at once** (for an edit that skipped the reviewer, the lead, on the
|
||||
operator's word) (`mesh/ready` and `ready at <full sha>`, the head it approved);
|
||||
mesh-delivery merges it when its checks pass. A fix to a module that changes how it runs carries an
|
||||
integration test starting the module whole against the real bus and store, run by the forge's checks
|
||||
(ADR 0391 §1, §6); unit tests alone, or a lab run, are not that proof. The operator's word is waited for only when the fix changes what the operator sees, removes data,
|
||||
(ADR 0391 §1, §6); unit tests alone are not that proof, and the lab is not used. The operator's word is waited for only when the fix changes what the operator sees, removes data,
|
||||
or needs the operator's terminal.
|
||||
7. **Follow its delivery plan to done** (`mesh-controller.plans` with `wait` and `until: done`), prove the fix on
|
||||
the mesh (the symptom gone, measured), and resolve the issue with `located-in` and `fixed-by` the same hour.
|
||||
@@ -76,7 +73,7 @@ reading itself and uses one subagent only for the review.
|
||||
- A small fix has one pull request with one or few commits naming its issue, opened after its review: a pull
|
||||
request with many heads is a fix reviewed after its push.
|
||||
- Its issue moves to `resolved` within the hour its delivery plan ends.
|
||||
- A pull request opened with no passing `mesh-controller.try` on its head, one reviewed and green but unmarked
|
||||
- A pull request reviewed and green but unmarked
|
||||
for more than 15 minutes, a fix to a module's running marked ready with no integration test of the module whole, or a review report
|
||||
asking a change outside the issue's done-when, is the failure of steps 4 to 6.
|
||||
- An issue in `fixing` with nobody on it shows in `issue-tracker.list` with `flag: abandoned`; a stopped fix
|
||||
|
||||
Reference in New Issue