Correct the record: a limitation that no longer exists, and one that was never written

The connectivity design still said a hub cannot be filtered — a gap recorded in
the morning and closed in the afternoon, left standing as though it were
current. Worse than a stale date: it would send somebody away from something
that works.

`restart-on` was described nowhere, including the part added today that lets a
service reflect a file another module put on the machine. A rule the host
enforces and no document mentions is a rule nobody can rely on.

And nine of fifteen design documents claimed an `updated:` older than their last
change, some by a week. That field is what cross-cutting views are generated
from, so it is not decoration.
This commit is contained in:
2026-08-31 12:33:35 +02:00
parent f4e81074d3
commit 573a94e102
10 changed files with 43 additions and 19 deletions
+1 -1
View File
@@ -2,7 +2,7 @@
layer: to-be
status: designed
code: [hal]
updated: 2026-08-23
updated: 2026-08-29
decisions: [02-DECISIONS/0001-mesh-brokers-nodes-host-agents-think.md]
---