From 600fa29566841a6296c4c515a3b017dceab24dd2 Mon Sep 17 00:00:00 2001 From: jochen Date: Sun, 22 Nov 2026 22:55:11 +0100 Subject: [PATCH] Design 47 H2: H-A-500 fourth addendum, the main hub works a take-in until the takeins durable is bound --- 03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md | 9 +++++++++ 1 file changed, 9 insertions(+) diff --git a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md index 8d3819a7..1fb34caa 100644 --- a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md +++ b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md @@ -1275,3 +1275,12 @@ The lead's one-line answers to the questions H2's develop and review raise (impl with its callers), checked by the catalog check that refuses a claim with an unserved verb (tools-are-how-a-module- is-spoken-to); and a validate run that waits on its manifest validator build says step-progress to the runner while it waits, so the runner's bound never fires on a run that is alive. P-failure-loud, principle 4. +- **H-A-500 fourth addendum (first start loses no take-in, 22:58)** 22 Nov 22:57: the developer found that the + takeins durable is made from the moment it is made, so a take-in said while the old runner was down reaches only the + main durable, which (b) acknowledges with no work: that take-in would start no pipeline. So: until the runner's own + takeins durable is bound, the main hub still does a take-in.taken's work; from the moment the bind succeeds, the main + hub acknowledges take-in.taken at once with no work, and the takeins durable starts from the moment it is made. No + deliver-from-earlier policy. Two points accepted as they stand: the grant also covers CONSUMER.INFO, because the + SDK's named-consumer bind reads it (third addendum (Q1) is read as create, info, pull, acknowledge); and a take-in + may now be heard before its catalog revision, the pipeline starts without steps and ยง200 places it. + P-failure-loud (nothing is lost silently); principle 4.