Break the bus work down, measured, in dependency order

Counting the surface first changed the plan twice: the genesis bed cannot run
until the links exist, so it belongs to step 4, and there is no conformance
suite to recapture — step 3 builds one against the current bus before moving
it. Both corrections are recorded in the breakdown rather than edited into
ADR 0115. Also indexes design 25, which was never listed.
This commit is contained in:
2026-09-26 18:24:14 +02:00
parent fe0c1e9da2
commit 6ab113e6c6
3 changed files with 256 additions and 0 deletions
+3
View File
@@ -307,6 +307,9 @@ when its retirement condition holds. The bus's port settings follow ADR 0100 lik
What is not done, at any step: no dual-bus period for the mesh's own traffic, no bridge, no module
rebuilt.
**The work of these five, broken down and measured, is [design 28](28-building-the-bus.md)** —
including the two places their dependencies put a bed later than the step that names it.
## 10. How it is checked
**A bed per step, and each is green before the step after it starts** — the division in §9 is only