Base layer: the mesh as it is, under the mesh as it should be
HQ held only the to-be. Every reader had to already know the system the decisions were about, and an as-is claim had nowhere to live except inside an intention. Adds 02-DESIGN/00-as-is — eleven documents written from the implementation and the operational record, not from intent, including the parts nobody would choose again. The two existing designs move under 01-to-be. Layers are declared in frontmatter and never mix: a design that ships does not move, its as-is counterpart is written, and both stand. Back-fills adr/0001-0014 for decisions taken in implementation and never recorded — the broker, the module abstraction, the mesh database, managed files, provisioning, migrations, the workspace removal, failing loudly, the constitution, application placement, linking, the employee model, the artifact, the three silos. Each marked reconstructed, dated from the history, and citing the evidence it was recovered from. The two existing records renumber to 0015 and 0016 so the ledger runs oldest first; 0017 extends 0015 to modules outside the core, principle only — the domain list is deliberately not invented here. how-we-build.md becomes the source of the mesh constitution, with a sync playbook, so the enforced copy stops being the only one that is true. Process becomes explicit: five playbooks, eight thin skills that defer to them, a repository map, and AGENTS.md with CLAUDE.md as its include. The five Observations become 04-ISSUES 001-005 where they can be owned and closed. 006 is new and uncomfortable: HQ is not indexed into the knowledge base. That claim is what decision 27 rests on, it was never checked, and the README now says so instead of repeating it. Also corrects the ADR index into something generated, the "02-DESIGN is empty" claim, the VISION.md pointer that did not survive the repo split, and a note asserting the symlink rule was contradicted — it was a misreading; the rule forbids hand-made links, the installer links by design.
This commit is contained in:
@@ -1,3 +1,8 @@
|
||||
---
|
||||
effort: 002-local-mesh
|
||||
updated: 2026-08-22
|
||||
---
|
||||
|
||||
# A mesh that runs locally — current state and obstacles
|
||||
|
||||
Evidence for Phase 0. Every claim here is either a file location or something measured on
|
||||
@@ -231,7 +236,7 @@ over either way.
|
||||
a local-mesh implementation detail — if the answer is that the mesh should own
|
||||
supervision, Phase 0 should not build a container-only workaround first. Under
|
||||
investigation; findings will land in [`003-service-supervision`](../003-service-supervision/)
|
||||
and, if it goes ahead, ADR 0002.
|
||||
and, if it goes ahead, a decision record of its own.
|
||||
|
||||
2. **What replaces `~/.config/hal/env` and `/services/` inside a container?** A configurable
|
||||
root keeps one code path; container-specific targets keep the host paths untouched. This
|
||||
@@ -248,9 +253,9 @@ over either way.
|
||||
|
||||
## References
|
||||
|
||||
- [`adr/0001`](../../adr/0001-mesh-brokers-nodes-host-agents-think.md) — the decision this
|
||||
- [`adr/0001`](../../adr/0015-mesh-brokers-nodes-host-agents-think.md) — the decision this
|
||||
phase unblocks
|
||||
- [`02-DESIGN/00-work-breakdown.md`](../../02-DESIGN/00-work-breakdown.md) — Phase 0 tasks
|
||||
- [`02-DESIGN/00-work-breakdown.md`](../../02-DESIGN/01-to-be/00-work-breakdown.md) — Phase 0 tasks
|
||||
and checkpoint
|
||||
- `troubleshooting/provision-adoption-rotates-live-credential` — fixture B, root cause open
|
||||
- `troubleshooting/deploy-reports-transport-not-effect` — the nine defects that shipped
|
||||
|
||||
@@ -1,6 +1,12 @@
|
||||
---
|
||||
status: graduated
|
||||
initiated: 2026-08-22
|
||||
touches: [02-DESIGN/00-as-is/04-delivery.md, 02-DESIGN/00-as-is/05-runtime-and-installation.md]
|
||||
became: [02-DESIGN/01-to-be/01-end-to-end-testing.md, adr/0016-a-lab-node-is-a-virtual-machine.md]
|
||||
---
|
||||
|
||||
# 002 — A mesh that runs locally
|
||||
|
||||
- **Status:** GRADUATED — the design is [`02-DESIGN/01-end-to-end-testing.md`](../../02-DESIGN/01-end-to-end-testing.md)
|
||||
- **Initiated by:** jochen, 2026-08-22
|
||||
- **Areas touched:** `install.d/`, `hal/meshware`, `hal/coordinator`, `hal/brain`,
|
||||
`hal/developer` (`dev_up`), `hal/sdk` (env generation, feature handlers, artifact
|
||||
@@ -9,7 +15,7 @@
|
||||
|
||||
## Summary
|
||||
|
||||
Phase 0 of [`02-DESIGN/00-work-breakdown.md`](../../02-DESIGN/00-work-breakdown.md) requires
|
||||
Phase 0 of [`02-DESIGN/00-work-breakdown.md`](../../02-DESIGN/01-to-be/00-work-breakdown.md) requires
|
||||
a mesh that comes up in containers, runs its own pipeline, and reproduces known faults on
|
||||
demand. Nothing else in the decomposition starts until it exists, because every fault the
|
||||
decomposition addresses was found in production — there was nowhere else to find it.
|
||||
@@ -18,7 +24,7 @@ This effort establishes what already runs in a container, what is welded to the
|
||||
what it would take to close the gap. It does **not** choose an approach: the central
|
||||
question — how a containerised node executes a module service, when a module service is
|
||||
defined today as a systemd unit shelling to `docker compose` in `/services/` — is not
|
||||
answered by ADR 0001 and is recorded below rather than decided.
|
||||
answered by ADR 0015 and is recorded below rather than decided.
|
||||
|
||||
## What was established
|
||||
|
||||
|
||||
Reference in New Issue