diff --git a/03-DESIGN/01-to-be/47-milestones/H-lead-answers.md b/03-DESIGN/01-to-be/47-milestones/H-lead-answers.md index 1b17dc36..77c5577e 100644 --- a/03-DESIGN/01-to-be/47-milestones/H-lead-answers.md +++ b/03-DESIGN/01-to-be/47-milestones/H-lead-answers.md @@ -2090,3 +2090,19 @@ Where two preparers disagreed, the chosen one is named. pacing; one journal line per seat; a key read twice between pages said; the head entry's count; the publish items' move with a message id; tags read once per take-in; the verb a build module calls to learn away. P3, P-failure-loud, test-budget. +- **H-A-341 (H2's part after the health and events review, 22:06)** (1) ADR 0282 §7 stands: the self-check's probe + reads the gate's times and raises over-budget with the class as its id, naming the revision and its longest phase; + the next delivery of the class clears it; the gate raises nothing. (2) prune-mark 70 % and prune-target 50 %, below + the bus module's raise mark; the owner judges its fill from the store's own figures at each write it makes (no poll, + no timer; amends H-A-339 (2) and H-A-340 (3)). (3) version-tagged-elsewhere clears at the module's next + version-released; record-too-large clears when the entry is next written within 64 KiB or at the record's end. + (4) A work-queue ask is re-put only on a transport fault of its put; its bound counts from the pull (H-A-340 (1)); + a step ended by its bound drops its ask (ADR 0664 §4). (5) Beside the two lines per step, the per-mover wait + lines (H-A-326 (3), §787) and §775's fault lines stay. (6) Every seat event body and verb answer carries form and is + decoded tolerantly (H-A-338 (8) on an absent form). (7) outputs and the install archives: max-age 7 days and a cap; + the builder deletes; output answers "no longer kept" past it. (8) A fetch's 401, 5xx or connection fault ends the + run again (§799), no seat call needed. (9) The H file joins the main file's reshaping run (H-A-334 (4)). Notes + taken: the consumes lists (runner: the two ask-taken; indexer: version-reserved); pipeline-ended carries unfinished + and a mover kept or added again is a journal line; the builder's health names an event backlog older than five + minutes; §790's and §803's tests show the clear; dry-run keys deleted at the indexer's start. P-NATS-native, + P-failure-loud, map-onto-how-the-mesh-is-built.