diff --git a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md index 40953a69..81cde5c6 100644 --- a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md +++ b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md @@ -1227,3 +1227,7 @@ The lead's one-line answers to the questions H2's develop and review raise (impl in hand on the node) in the environment (`MESH_TEST_BOUND_SCALE`), and the SDK's test harness multiplies its setup and per-test bounds by it (1 when unset); the failure text names the scale and the bound used. Quick recovery: the two movers are started again at the same revision after the pipeline ends (H-A-479). P-failure-loud; test-budget. +- **H-A-499 WITHDRAWN (02:20)** The 30 s setup bound is the Go build module's own level judge, already scaled by the + steps in hand since H-A-488 (mesh-catalog #740); the failures of 21:28 and 21:32 ran on the OLD build module still on + shanks (#740 waits in main.308). Nothing to build; the SDK harness has no per-test bound. The lesson stands in + the save point: read which build runs on the node before answering a fault the merged fix already covers.