diff --git a/03-DESIGN/01-to-be/47-milestones/G-22-lead-answers-2.md b/03-DESIGN/01-to-be/47-milestones/G-22-lead-answers-2.md index bac1be9a..5c95167a 100644 --- a/03-DESIGN/01-to-be/47-milestones/G-22-lead-answers-2.md +++ b/03-DESIGN/01-to-be/47-milestones/G-22-lead-answers-2.md @@ -586,3 +586,9 @@ the principle that settles it, cited as "design 47 G A-n". catch-all of seat events by one handler per seat it consumes; for the seat `mesh-catalog` it takes each event it consumes except `registration-changed`, which the branches follower takes, and whatever the watchman needs of that event it takes from the follower. The SDK's hub keeps one taker per message. +- **A-323** (§49, §268; principle 3) The assigner and the node-engine on one node are an acting cycle of delivery edges + only (compose and place), so they are delivered as one step (§49), never held by each other: the assigner writes that + node's node-engine want first, held by nothing but its build (§268), and holds the node's other wants, its own included, + until the node-engine seat says the new version runs there. The acting-wait check finds a cycle across steps as well as + within one, and a want held on a cycle it cannot break says so as a finding (found in the dry run of G on itself, + 2026-11-13).