From 9246148808ddc946f697de83dce3ff128cd60cf4 Mon Sep 17 00:00:00 2001 From: jochen Date: Tue, 24 Nov 2026 01:08:28 +0100 Subject: [PATCH] Design 47 H2: H-A-635, a slow pass of the assigner says which phase it is in (issue 1984) --- 03-DESIGN/01-to-be/47-milestones/H2-lead-answers-3.md | 11 +++++++++++ 1 file changed, 11 insertions(+) diff --git a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers-3.md b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers-3.md index b6ba8dea..909e556f 100644 --- a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers-3.md +++ b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers-3.md @@ -561,3 +561,14 @@ where the design and the code disagree; the lead's answers follow, each against where a package path's Go module requires a module of its own repository at the zero version, resolved only through that path's module file, and its listing names that module's imports; live, the next pipeline whose movers hold mesh-delivery-contracts passes its build. Principles 3 and 7. +- **H-A-635 (a slow pass of the assigner says which phase it is in, 01:08)** 24 Nov, issue 1984; answers the stall met + 2026-11-23 23:53:48 UTC: the assigner on one machine logged "the pass took" (H-A-259) every 20 s, then nothing for six + minutes at near-zero CPU while every validate and composition step of a 70-mover pipeline waited; a read of its locks + found no cycle, and no tool takes a stuck process's stacks, so where it stood is not known. The pass names the phase it + is in as each starts (the assignments seat, the kept graph, the wants, the pass said, the puts, the node wants, the + backups and reverts), in the passer's own memory; a pass still running after the assigner setting + `pass-stall-seconds` (10 to 600, default 60) says once in the journal "the pass started at