diff --git a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md index 922d1e62..8d3819a7 100644 --- a/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md +++ b/03-DESIGN/01-to-be/47-milestones/H2-lead-answers.md @@ -1267,3 +1267,11 @@ The lead's one-line answers to the questions H2's develop and review raise (impl for the picture (bounded by the step's own bound, saying what it waits for) instead of failing; it fails only when the picture holds a newer revision that does not name the fingerprint. P-failure-loud (a cold start is not a failure of the change). +- **H-A-503 (the assigner serves every verb its seat promises, and a validate run says its progress, 03:50)** 22 Nov + 22:29: the assigner's tool runner said "mesh-delivery-assigner claims mesh-wants and implements no drop, which that + seat promises; not served" (the same for input, compositions, compositions-drop, keep-now), so the runner's drop of a + stuck validate found no responder; the live seat list holds neither. So: the seat's verbs and the holder's tools are + brought into line in one change (a tool named for each verb the seat promises, or the verb struck from the contract + with its callers), checked by the catalog check that refuses a claim with an unserved verb (tools-are-how-a-module- + is-spoken-to); and a validate run that waits on its manifest validator build says step-progress to the runner while it + waits, so the runner's bound never fires on a run that is alive. P-failure-loud, principle 4.