Phase 1.2 done, and it is the same surprise as 1.1
A session as a licence consumer needed no change either: the two sessions are two modules, so the existing (node, module) binding already names them apart. 14-model-access.md's "a step toward it and not it" is true of a worker and not of a session, and the difference is that there is one session per node rather than many per machine. Records what stays open: the worker half of that gap is real and unaffected, and belongs with 0003, which is unbuilt. Two tasks in a row that were already possible. Both were written from the design rather than from the code — the review's own finding arriving in the plan it produced. The remaining Phase 1 items should be checked against the code before being started rather than after.
This commit is contained in:
@@ -58,7 +58,7 @@ Found by taking real modules and asking what they would require. Each is a gap i
|
||||
| # | task | done when |
|
||||
|---|---|---|
|
||||
| ~~1.1~~ | ~~An **object-store provision**~~ — **done 2026-08-31**, and it needed no change to the mesh: see below | seven assertions against a real store |
|
||||
| 1.2 | **A session as a consumer of a licence** | the two sessions on one machine hold different licences and each uses its own ([`14-model-access.md`](14-model-access.md), [ADR 0026](../../02-DECISIONS/0026-the-mesh-has-a-session-of-its-own.md)) |
|
||||
| ~~1.2~~ | ~~**A session as a consumer of a licence**~~ — **done 2026-08-31**, and it also needed no change: see below | two sessions on one machine, different licences, each its own key |
|
||||
| 1.3 | A **network** shape, and ordering within a module | a module of several containers reaches itself, and one that must start after another does |
|
||||
| 1.4 | **Public certificate issuance** | a name reachable from outside is served with a certificate from a public authority, obtained against a **staging** endpoint unless told otherwise ([`04-ISSUES/004`](../../04-ISSUES/004-certificate-issuance-targets-production/00-report.md)) |
|
||||
|
||||
@@ -67,6 +67,20 @@ a mail system needs and nothing else so far does.
|
||||
|
||||
**Checkpoint:** each is demonstrated in the lab before the module needing it is attempted.
|
||||
|
||||
### 1.2, and the same surprise twice
|
||||
|
||||
**A binding is per module per machine, and the two sessions are two modules** — the same mechanism
|
||||
in different context roots, and a context root is what a module delivers. So `(node, module)`
|
||||
already names them apart, and nothing needed adding.
|
||||
[`14-model-access.md`](14-model-access.md) had called per-module-per-machine *a step toward it and
|
||||
not it*, which is true of a **worker** — many run on one machine from one module — and not true of
|
||||
a session, of which there is one per node and one for the mesh.
|
||||
|
||||
**Two tasks in a row that were already possible.** Both were written from the design rather than
|
||||
from the code, which is the review's finding arriving in the plan: *a claim here is counted, not
|
||||
reasoned.* The remaining Phase 1 items should be checked against the code before being started,
|
||||
not after.
|
||||
|
||||
### 1.1, and what it turned out to be
|
||||
|
||||
*Done 2026-08-31. Worth recording because the task was not the one written down.*
|
||||
|
||||