Design 47: release 1-2 is the six milestones R1a to R2c, each one release; playbook 04 splits a milestone that holds a release order (the operator, 2026-10-19)
This commit is contained in:
@@ -17,7 +17,11 @@ A design becomes **milestones**, and each milestone becomes **issues**:
|
||||
- **Milestones are cut by release order.** A milestone ends where one repository's change must be released before
|
||||
another can use it (a new manifest word before the catalogue reads it, an SDK change before its users, until
|
||||
design 47's milestones 3 and 6 lift those orders); the lead checks this when cutting, so no milestone needs a
|
||||
second release.
|
||||
second release. The orders to look for are those playbook [07](07-feature-branches.md) step 0 item 6 names (an SDK
|
||||
change before its users, a new wire key before the node that reads it, the first module of a repository the catalogue
|
||||
never built, a part that needs a decision first); a milestone cut by such an order may be usable only by the next one,
|
||||
and says so in its outcome. A milestone the prepare step finds holding such an order is split into milestones in the
|
||||
design, each one release, never carried as parts of one (2026-10-18: design 47's release 1-2 became six).
|
||||
- **An issue is one repository's part of a milestone,** sized so a fixing agent finishes it inside the
|
||||
milestone's development time. Issues that must land in order are linked `depends-on`.
|
||||
|
||||
|
||||