Renumber the records 1 to 23
The consolidation left a sparse sequence -- 1, 4, 6, 7, 9, 10, 12, 15, 16, 18, 19, 25, 34, 35, 36, 37, 40, 42, 44, 45, 48, 49, 58 -- where the gaps were only the archaeology of what used to be there. Renumbered contiguously. Renames run in ascending order, so every target number is already free and no two files ever collide. The reference rewrite is one simultaneous pass rather than a sequence of replacements. Numbers moved into slots other numbers were vacating -- the node host went 37 to 16 while the lab went 16 to 9 -- so replacing one at a time would have cascaded and silently pointed things at the wrong record. Seven plain-text references survived the merges as prose rather than links, naming records that no longer existed: the enrolment token, the link boundary, what a declaration is, reachability, the repository structure. Each mapped to the consolidated record that now holds it. Verified rather than assumed: every [ADR NNNN](path) link now has matching text and target, checked across the whole repository, and the checker passes. Frontmatter `consolidates:` lists dropped -- they named records that are gone, and each consolidated record already says in prose what it absorbed.
This commit is contained in:
@@ -3,12 +3,12 @@ layer: to-be
|
||||
status: designed
|
||||
code: [hal]
|
||||
updated: 2026-08-23
|
||||
decisions: [02-DECISIONS/0015-mesh-brokers-nodes-host-agents-think.md]
|
||||
decisions: [02-DECISIONS/0008-mesh-brokers-nodes-host-agents-think.md]
|
||||
---
|
||||
|
||||
# Work breakdown — the decomposition
|
||||
|
||||
How [ADR 0015](../../02-DECISIONS/0015-mesh-brokers-nodes-host-agents-think.md) gets built, in what order, and where a human must look.
|
||||
How [ADR 0008](../../02-DECISIONS/0008-mesh-brokers-nodes-host-agents-think.md) gets built, in what order, and where a human must look.
|
||||
|
||||
Ordering is not preference. Each phase removes a constraint the next one needs gone.
|
||||
|
||||
|
||||