From e268980db14a34d202cbf63d95c0cb82bd33504c Mon Sep 17 00:00:00 2001 From: jochen Date: Sat, 21 Nov 2026 12:43:08 +0100 Subject: [PATCH] Design 47 H: section 10, finding 137 --- .../01-to-be/47-milestones/H-deliver-the-delivery-system.md | 1 + 1 file changed, 1 insertion(+) diff --git a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md index 53144b58..4904f5c9 100644 --- a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md +++ b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md @@ -653,3 +653,4 @@ Added by the lead at 21:30 CET, from the run of 19:50 to 21:30; a row met again | The four hand packs went onto the control-node between 12:14 and 12:23 (the pipeline runner with its bounded asks, the indexer with its finding kinds, the provisioner from main, the tool runner for seventeen units), every unit active: the provisioner composed every machine from 12:17 without the stale first view; the tool runner's "finding kind not declared" line stopped; the mesh MCP server dropped for a minute at 12:16 and came back by itself; and the big pipeline's validate (row 126's kind) was asked again with the fixed verb at 12:23 and runs under its bound (rows 117, 130 and 133); the runbook. | H1 | | Proof 1 (its second run) is shown: the wallpaper file on the desktop and the build node carries the merged line, read at 12:26. The chain: merged at 11:07:56, taken in at 11:10:47, placed at 11:48:00, passed at 11:49:06, the want written at 11:54:21, the node-engines applied it within a minute, the provisioner's plan named the new files archive at about 12:23 once a current provisioner ran, and the file was written by 12:26. No hand act touched the module's own path; the hand acts were on the delivery system's parts (the assigner on the build node, the cancel of the held pipeline, the provisioner). The time from merge to running was 78 minutes, 37 of them in the queue and 30 waiting on a stale provisioner, so ADR 0282's five minutes is not met (rows 111, 127, 128 and 133); the runbook. | H1 (the proof); H2 (the bound) | | Proof 2 began: the SDK's one-line change and the tool runner's were merged in one call at 12:26:59 (the seat git's merge verb with two members), the gate moved main's source to one revision for both repositories, and the indexer took both in together at 12:27:18 as one pipeline of 126 movers, the SDK and the tool runner among them (the SDK's release re-pins every importer); the pipeline waits fifth in the queue (rows 127 and 135). The acceptance: the tool runner runs on every machine at the new SDK version with no hand act; the gate, the indexer (`mesh-delivery-indexer`) and the pipeline runner (`mesh-delivery-pipeline`). Owed: a tool that reads one pipeline's movers, with the lighter read per step (row 124's kind). | H1 | +| The change of the holder of the seat mesh-wants for row 131 was built, reviewed in two rounds and merged at 12:41 as its own pipeline; the first round found wants written at the start before any revision is kept, and the full-store verdict moved out of the pass, both settled by H-A-261 (no want before a revision is kept; the full-store verdict is the pass's own); the holder of the seat mesh-wants (`mesh-delivery-assigner`). The reviewer's notes stay owed: the bus wrappers' race on one handle, met twice (a handle per goroutine, or a guard in the SDK), and a failed first keeping holding the wants until the next event. Also seen: with the pipeline runner's change live, the waiting pipelines collapsed as designed at 12:38 (three left the queue, their movers moved by the newest), so proof 2's pipeline stands next after the one running (rows 130, 131 and 136). | H1 (the change); H2 (the notes) |