diff --git a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md index cc2105fa..bdd417b5 100644 --- a/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md +++ b/03-DESIGN/01-to-be/47-milestones/H-deliver-the-delivery-system.md @@ -299,8 +299,14 @@ branch; the single commit is the case of one member); the setting of item 7 keep the design says serial. Question 4: "I don't mind doing hand placements": yes. Question 1: the operator's first idea was a build plan and a deploy plan per change (ADR 0238 §2, "one commit, one change plan", the glossary's *delivery plan*, deleted at release 6 of ADR 0429 and replaced by ADR 0666's pipelines per module ordered by edges, from research 086); -what remains open is only how the mesh learns which commits belong together, since ADR 0666 §13 reads a shared branch -name through pull requests. The operator also said they would not mind a start from scratch; the lead's answer is in +what remained open was how the mesh learns which commits belong together, since ADR 0666 §13 reads a shared branch +name through pull requests. The operator, 01:15 CET: since every version is deployed by a merge into main, an action, +they have no objection to kicking the build-and-delivery process off by hand instead of listening to the forge's +hooks; the lead named principle 3 (a kick-off a person forgets is a silent non-delivery) and proposed the merge through +the mesh as the kick-off with the forge's event kept as the watchdog; the operator chose it (01:20 CET, "A, go +ahead"): one call of the seat `git`'s verb `merge-pull` naming one or more pull requests is the delivery's start and +the group; nothing reads a pull request after it; a head moved outside the mesh raises a condition and delivers +nothing. Item 1 below is answered so; item 6 is written from it. The operator also said they would not mind a start from scratch; the lead's answer is in section 2 (fix in place, two parts written again) with the reason: 78 per cent of the lines are built by their contract, and the parts that are the earlier model are named and bounded.