One push leaves the mesh consistent (the 057 decision, proposed for
acceptance); the shared runtime waits for its broker (058). Fixes on
mesh-control fix/one-push-is-enough and mesh-tools
fix/the-runtime-waits-for-its-broker; the built-store-cross-node bed
enforces both.