Hosts first, then the controller — a build and a push each, now that the
mesh delivers the host. The host refuses a lower sequence than it kept
and drains a batch by sequence rather than arrival; the controller
numbers each send under the node's hold, inside the signed bytes.
Measured: two pushes, sequence 2 in the kept declaration, counters in
the store agree, no machine reads as behind. That last one is the
subtlety: the mesh compares the digest of what it would send against
what it did, and a number changes the bytes, so the read-only comparison
composes with the last number sent rather than a fresh one.
All four machines run a host the mesh built, published and delivered, the
last delivery unattended: each stood aside once for a genuinely newer
version and the delivered launcher started it. A following push that
delivered nothing new was applied and reported by every machine and stood
nobody aside.
The crossover needs one restart of the unit per machine, once, because
the running launcher executes from its own inode. Measured timing: three
seconds on the machine, 17-20 as the operator sees it, the difference
being the control plane composing before it sends.
107 is unblocked: a declaration field is now a build and a push.
145, partly resolved. The sentence that was true for eleven hours of a
mesh in which no module could reach another now says what it is not a
claim about: that is the mesh and the machines agreeing, and nothing here
dials a provision. It checks nothing and does not pretend to — ADR 0146
decides the check and is deliberately not built. What changed is that the
report no longer implies otherwise. Stays open for that reason.
Carried forward: 0146's check needs an internal name fetched over TLS with
the certificate verified, and until today no machine trusted the mesh's
authority. Three of four do now, so whoever builds it does not have to
solve that first.
107, diagnosed and deliberately not built. The premise is confirmed in the
host's own words — unknown fields are refused because "a field the host
does not know is a thing the control plane believes it asked for" — so the
fix is a flag day, not an addition. 087 now makes the cost measurable, and
the measurement is why it waits: one machine of four runs an older host,
it is parked, and nothing delivers a host at all (142). Shipping the field
means hand-placing binaries and unparking a machine, and one missed in
that sequence is unreachable, not degraded. The fault it prevents has
never been observed.
142 gains the note that it is 107's gate, and that it is what makes a
declaration field cost a rollout instead of an expedition.
A judgement about order, not a refusal, and cheap to overrule.
The machine has reported its host version since ADR 0141, whose own
comment says why it must: without it nothing can say a machine is behind.
The controller's copy of the report did not have the field, so it
unmarshalled into nothing and was thrown away on arrival. Two structs
describe one message and only the sending side had it.
node show names it per machine, "not reported" where the mesh has not been
told. status names every machine running an older host than another does,
and which is newest.
Disagreement rather than staleness, deliberately: nothing delivers a host
version yet, so the mesh holds no canonical current one and "behind" has
no fixed point. What it can say is that the oldest host in the mesh is
what the mesh may send.
Two refusals to guess: a machine that reported nothing is not called
behind, and versions compare as strings — right for the timestamps this
mesh uses, wrong for a scheme where 10 sorts before 9, said at the place
that would have to learn.
107 gains the note that this is what makes its new field safe to consider,
and that one machine of four is behind today, so it is not free yet.
Both from the review of the issue-104 fix: a hand-applied file on an enrolled node is
recorded as carried and would remove the foundation, and nothing on the wire orders one
declaration against another.