jschoubben 17c2e061df Phase 1 was mostly a phantom: correct doc 19 and the WBS
The protocol spec claimed the envelope and grant drifted across implementations.
Inspection showed the wire agrees — envelope required headers match, the two
optional ones are legitimately optional, and the grant wire (the contributions
file) is identical on both sides. The disagreement was in dead types, now removed.

So phase 1's 'make them agree' work is done by deletion and correction. What
remains is a conformance fixture as prevention — pinning the envelope and the
contributions file so a future change that breaks agreement fails a test — and a
full per-capability suite is deferred until a third language actually needs it.

Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
2026-09-16 00:07:26 +02:00
jschoubben 6e1099a905 Reorder the work: implement and unit-test first, run the lab once at the end
The correction the operator pushed: stop running a 20-minute lab against a mesh
mid-transformation, debugging paths the next phase deletes. The base-build hang
is almost certainly the SDK resolving from a git URL inside a docker build (issue
053), which Phase 2 removes — so debugging it on the current shape is debugging
deprecated code.

Phase 0 folds in: the installer's own regressions are fixed and committed;
whether it runs green is the final acceptance test, after the phases that change
its build path are in. Faults that can be reasoned out of the code path are, by
reading rather than running.

Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
2026-09-16 00:02:51 +02:00
jschoubben 2e1ae061b5 The work ahead: four phases, dependency-ordered, each ending at a run
Everything decided this cycle and not yet built. Phase 0 gets the installer
green, because nothing else is testable end to end without it. Phase 1 makes the
protocol one thing and fixes the Go/TS drift the installer's own provisioning
exercises. Phase 2 stands up the private package registry ADR 0014 assumes and
publishes the SDK into it. Phase 3 adopts the substrate so one postgres and one
lavinmq serve everything, which is the hardest and needs all three above.

Order is dependency, not preference. Each phase ends at a run rather than a
paragraph, because a phase that ends at a claim is how things went missing this
cycle without anything complaining.

Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
2026-09-15 23:41:42 +02:00