Release 6 deletes delivery plans, batches, the merge window and tiers, so
design 47's sections that described them as current are rewritten to the
assigner's seven rules, the controller's signed compositions per node, the
node agent, credentials on a done build, the switch as release 5's last plan,
the hand path by mesh-compose and a want, and the view's delivered, moving,
settled and stuck events. The glossary gains composition and restates want,
declaration, send and apply; the playbooks follow a delivery by the view and
the have keys and call no plans, plan, push or what-if.
Design 63 turns the mail page into the operator's list with Owly beside it (ADR 0515
to 0519), in six milestones with their issues; its reference mockup is kept beside it,
its data invented. Playbook 10 says how a page is designed before it is built: mockups
with fixed data, the operator picks, the pick is the reference. The as-is of the mail
modules now describes mail reading as delivered, the glossary gains design 63's words,
design 59's milestone 4 is marked replaced, and AGENTS.md allows a design's mockup.
Issues 1855 and 1856.
mesh/merge-gate head 9a74de0bd64f merged into trunk 77d4a8a39e1f — pass: group feat/quiet-deliveries composed: every machine composes with the change as it…
The operator, 2026-10-22: a milestone is a milestone; which module reaches the machines first is what the delivery plan is for. The prepare step still lists every part a change reaches, as issues of the same milestone; an order the plan cannot keep is an issue of the build and delivery system.