Commit Graph
11 Commits
Author SHA1 Message Date
jschoubben 4b514e4d69 Design 47, the glossary and playbooks 04, 07 and 08 for release 6: wants and signed compositions, no plans (ADR 0539, issue 1130)
Release 6 deletes delivery plans, batches, the merge window and tiers, so
design 47's sections that described them as current are rewritten to the
assigner's seven rules, the controller's signed compositions per node, the
node agent, credentials on a done build, the switch as release 5's last plan,
the hand path by mesh-compose and a want, and the view's delivered, moving,
settled and stuck events. The glossary gains composition and restates want,
declaration, send and apply; the playbooks follow a delivery by the view and
the have keys and call no plans, plan, push or what-if.
2026-10-24 21:01:24 +02:00
jschoubben 8498006d23 Playbooks 07 and 08: answer the review (no lab, plain words, checks on the forge, issue 1941) 2026-10-24 12:50:35 +02:00
jschoubben d20ed892cf Playbooks 07 and 08: three questions in the milestone file, and a try before a merge by hand (research 071, issue 1921) 2026-10-24 12:45:57 +02:00
jschoubben c8ccbfe35f Playbooks 07, 08 and the overview name what runs: the checker's try and status, hq's Go tests, the stream backlog, and the way to deliver without the builder (issue 1888) 2026-10-23 15:17:30 +02:00
jochen 5d745d04db Write design 63 and playbook 10, so the mail page's next steps are built from a picked design
Design 63 turns the mail page into the operator's list with Owly beside it (ADR 0515
to 0519), in six milestones with their issues; its reference mockup is kept beside it,
its data invented. Playbook 10 says how a page is designed before it is built: mockups
with fixed data, the operator picks, the pick is the reference. The as-is of the mail
modules now describes mail reading as delivered, the glossary gains design 63's words,
design 59's milestone 4 is marked replaced, and AGENTS.md allows a design's mockup.

Issues 1855 and 1856.
2026-10-22 18:42:42 +02:00
jschoubben 9a74de0bd6 Name the session that pushed a head in its pull request, so a head that needs a new one names its author (ADR 0505 §5)
mesh/repo-check head 9a74de0bd64f merged into trunk 77d4a8a39e1f beside mesh-catalog#444@09e749bc +1 more — pass: its merge-check.sh passed
mesh/merge-gate head 9a74de0bd64f merged into trunk 77d4a8a39e1f — pass: group feat/quiet-deliveries composed: every machine composes with the change as it…
mesh/delivery delivered
mesh/delivery-group group feat/quiet-deliveries merged: every member is merged
2026-10-22 14:25:50 +02:00
jschoubben 2b857df4b5 Never cut a milestone by an order between its parts: the delivery plan keeps that order from the module graph
mesh/merge-gate head 2b857df4b51e merged into trunk 73a06324dc0d — pass: the change touches no module of the mesh's graph
mesh/repo-check head 2b857df4b51e merged into trunk 73a06324dc0d — pass: its merge-check.sh passed
mesh/delivery delivered
The operator, 2026-10-22: a milestone is a milestone; which module reaches the machines first is what the delivery plan is for. The prepare step still lists every part a change reaches, as issues of the same milestone; an order the plan cannot keep is an issue of the build and delivery system.
2026-10-22 01:30:20 +02:00
jschoubben 0162e04f92 Describe a milestone as one delivery group released by one plan, and make a fix found during it ride in the group
mesh/merge-gate head 0162e04f9275 merged into trunk d5d821220494 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 0162e04f9275 merged into trunk d5d821220494 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-21 18:08:58 +02:00
jschoubben c6fc663019 Make a small fix in mesh-sdk or mesh-controller ride with the milestone's release, so each is delivered once per milestone 2026-10-21 18:04:49 +02:00
jschoubben 5816ca669f Say the page's freshness is not yet checked (issue 1222), and fix 08's leftover 'reviewed after its push' (review round 1)
mesh/merge-gate head 5816ca669f20 merged into trunk f269e83f5d1a — pass: the change touches no module of the mesh's graph
mesh/repo-check head 5816ca669f20 merged into trunk f269e83f5d1a — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-19 13:29:22 +02:00
jschoubben afe83b9124 Keep the drawn overview of the playbooks in hq, for a later docs site 2026-10-19 13:27:55 +02:00