Each issue is resolved with its fix and a replay or the reason none exists, or re-checked against main and the live mesh on 2026-10-08.
Phase 0 is being built in mesh-controller and mesh-host. Granting the controller its own buckets showed that its grant never covered the work queues' cancelled sets, so every cancel times out.