jochen 2d18fa3380 Triage issues 228-278: close the fixed, re-check the rest
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
Each issue is resolved with its fix and a replay or the reason none exists, or
re-checked against main and the live mesh on 2026-10-08.
2026-10-08 01:31:10 +02:00
jochen a6c0f002a5 To-be 45 in progress; issue 269: the controller cannot write a cancelled set
Phase 0 is being built in mesh-controller and mesh-host. Granting the
controller its own buckets showed that its grant never covered the work
queues' cancelled sets, so every cancel times out.
2026-10-06 03:04:36 +02:00