Commit Graph
15 Commits
Author SHA1 Message Date
jschoubben 76cd91413e ADR 0093: a fixture that runs a module's runtime carries its name; 074 diagnosed, two beds converted; 075 resolved 2026-09-21 19:30:35 +02:00
jschoubben 5dcb9dfbf6 ADR 0089: a bed reads the catalogue it proves; issue 073 diagnosed; issues 074 and 075 opened
The end-to-end design held 'the run rebuilds what it tests' for binaries and images
and not for manifests. The beds' inline copies fell into three kinds; only the first
is a stale copy. The other two are named: a mesh test wearing a catalogue module's
name (074) and a stocked runtime image the run never rebuilds (075).
2026-09-21 14:35:08 +02:00
jschoubben 33a00d5656 Adopt the glossary's vocabulary in the mutable design docs
"control plane" -> controller and "substrate" -> foundation throughout
03-DESIGN, 00-META and the README, with 06-the-control-plane.md and
07-the-substrate.md renamed to 06-the-controller.md and 07-the-foundation.md.
The immutable 02-DECISIONS records keep their original wording (and links to
them are unchanged) — a term retired here may still appear there, which the
glossary explains how to read.

Claude-Session: https://claude.ai/code/session_01D6qtiYU3P9jk3pnAXyAFyx
2026-09-16 18:48:52 +02:00
jschoubben cb1954e7b5 Accept 0024, and rewrite the work breakdown around what is actually being done
**0024 accepted.** Model access was decided, built, and proven in the
lab, and two design documents rest on it; only the status had never
moved. The gate is green again.

**The work breakdown rewritten.** It planned a decomposition of the
existing system in place — extract contexts, declared features, shrink
the shared library. That is not the work. A replacement is being built
beside it, and only the old Phase 0 survived contact with reality, so
the one document meant to say what happens next was describing a system
being retired.

Now ordered by what "modules move across one at a time until the old
registry is off" actually requires:

- Phase 0 is marked done against the twenty-two lab assertions, **and
  carries its own limitation**: every module exercised was written to
  test the mechanism, so the vocabulary was shaped by its own fixtures.
- Phase 1 is the vocabulary gaps found by asking what real modules
  need — an object-store provision, a session as a licence consumer, a
  network shape with ordering, public certificate issuance.
- Phase 2 is one module, then a week of running it, because the point of
  going first is to find what Phase 1 missed.
- Phase 3 picks modules that each prove something the first did not; the
  mail system is last because it is the one that may send work back into
  the declaration language.
- Phase 4 is switching the registry off, named as a phase so it is not
  mistaken for the goal.

Keeps the rules of engagement unchanged — they were about how work is
done, not what it is — with one addition: stop and ask before anything
that touches a machine outside the lab.

Adds a section on keeping the list true, since the document it replaces
was wrong for weeks and nothing said so. A claim here is counted, not
reasoned, and a phase is done when the lab says so.
2026-08-31 17:25:27 +02:00
jschoubben 345bbe0552 005 resolved: a suite that cannot run on every push says when it last ran
Retired in favour of the lab rather than repaired — that answers the
first open question. The second finding is the one that generalises:
"nothing runs it, and nothing reports that nothing runs it" is not a
fact about that harness, it is a fact about any suite too expensive to
run on every push. The replacement inherited the fault it was replacing.

Records the three rules that now hold, and what the fix taught twice:
the remedy rebuilt the symptom inside itself, and the code that counts
results passed every test while reading nothing.
2026-08-31 15:02:26 +02:00
jschoubben 573a94e102 Correct the record: a limitation that no longer exists, and one that was never written
The connectivity design still said a hub cannot be filtered — a gap recorded in
the morning and closed in the afternoon, left standing as though it were
current. Worse than a stale date: it would send somebody away from something
that works.

`restart-on` was described nowhere, including the part added today that lets a
service reflect a file another module put on the machine. A rule the host
enforces and no document mentions is a rule nobody can rely on.

And nine of fifteen design documents claimed an `updated:` older than their last
change, some by a week. That field is what cross-cutting views are generated
from, so it is not decoration.
2026-08-31 12:33:35 +02:00
jschoubben 333356cff3 Order the records the way the system is learned
Jochen asked whether the order made sense. It did not -- it followed when
things happened to be decided, which after consolidation is fictional anyway
since record 5 alone folds decisions taken across a week.

Concretely wrong before: the domain statement sat at 8, after five engineering
rules; the constitution was scattered across 5, 12 and 17; the tiers landed at
15, 16, 21 and 22 with process records in between.

Now it walks: what the mesh is (1-3), its tiers from the bottom up (4-8), what
runs on them and how it gets there (9-10), how it is built (11-16), how it is
checked (17-18), how we work (19-23).

Two things made this safe rather than free. It is a permutation, not a
compaction, so the renames go through temporary names -- otherwise two files
want one slot and one is lost. And the reference rewrite is a single
simultaneous pass, because almost every number moved into a slot another number
was vacating; replacing one at a time would have cascaded and pointed things at
the wrong record while still resolving.

Verified: 284 [ADR NNNN](path) links across the repository, all with matching
text and target.

The ordering principle is now stated in 19 rather than left implicit -- the
repository already said "the numbering is the flow" about its folders, and
there was no reason for the records to be the exception.
2026-08-28 23:30:42 +02:00
jschoubben e1febe8e0f Renumber the records 1 to 23
The consolidation left a sparse sequence -- 1, 4, 6, 7, 9, 10, 12, 15, 16, 18,
19, 25, 34, 35, 36, 37, 40, 42, 44, 45, 48, 49, 58 -- where the gaps were only
the archaeology of what used to be there.

Renumbered contiguously. Renames run in ascending order, so every target number
is already free and no two files ever collide.

The reference rewrite is one simultaneous pass rather than a sequence of
replacements. Numbers moved into slots other numbers were vacating -- the node
host went 37 to 16 while the lab went 16 to 9 -- so replacing one at a time
would have cascaded and silently pointed things at the wrong record.

Seven plain-text references survived the merges as prose rather than links,
naming records that no longer existed: the enrolment token, the link boundary,
what a declaration is, reachability, the repository structure. Each mapped to
the consolidated record that now holds it.

Verified rather than assumed: every [ADR NNNN](path) link now has matching text
and target, checked across the whole repository, and the checker passes.

Frontmatter `consolidates:` lists dropped -- they named records that are gone,
and each consolidated record already says in prose what it absorbed.
2026-08-28 23:28:34 +02:00
jschoubben 5e83ac2c22 Consolidate: 65 decision records to 52
Jochen: a normal application has 3-5 ADRs, maybe 10 for a large one, and we are
at 65. Fair, and the cause is mine -- I recorded every FINDING as a decision
rather than every fork in the road.

Two merges, both cases where one decision had been split across many records
because it was taken over several days rather than at once.

0019 absorbs ten records about how this repository works: what it is and that
it is public, the folder flow, the two design layers, the issue front door,
status in frontmatter, playbooks, the naming rule, the product name. Those were
never ten decisions -- they were one, seen from ten angles as the repository
took shape.

0016 absorbs the five about the lab: a node is a virtual machine, a router is
scenery, a scenario declares the underlay, a scenario is a closed address
space, and the two scenario classes. Same pattern -- one design, split by the
order it was worked out in.

The consolidated 0019 also raises the bar for what earns a record, since that
is what produced 65: a record is warranted when there is a genuine fork -- a
direction reversed, an alternative that will be proposed again, something
contested. A finding is not a decision, and a bug is certainly not. Everything
else belongs in the design document where the reasoning is actually read.

The checker earned its place here. Deleting nine records left 13 dangling links
across the repository and it named every one, including in AGENTS.md. Nothing
was found by reading.

Remaining clusters worth the same treatment: the host (8 records), delivery
(5), modules (6), connectivity (4), substrate and control plane (4). That would
be 52 down to roughly 30.
2026-08-28 18:53:19 +02:00
jschoubben 4d19e93900 Name the substrate's actual products
The design layer described every service by role and never once by name:
Postgres appeared in zero design documents. That was over-application of the
research rule "never identify the mesh it observed", which is about node names
and domains, not software.

Two things were actually broken by it. substrate.lock pins images by digest and
a digest belongs to a named image, so the bundle could not be written from the
design. And a reader could not tell a settled choice from an unexamined one --
"a relational store" reads identically either way.

ADR 0048 names them: PostgreSQL, LavinMQ, MinIO, an OCI registry, Docker. The
argument for each is continuity, which is a real argument -- replacing a
substrate service migrates the mesh's own state. Role and product are now both
written, because the design depends on the protocol while the installer needs
the product.

Also separates two questions the substrate doc had merged: being substrate and
being in the bundle. Only Postgres must precede the control plane; the rest are
substrate by role and ordinary by delivery. Whether the bus joins it is left
open, because it turns on the control plane's internal shape.

Names the forge as Gitea, and records ingress/Traefik as an unclosed gap rather
than a naming one -- nothing says what terminates TLS or which tier owns it.

Fixes a miscount: the host's bootstrap vocabulary is six shapes, not five.
2026-08-27 00:11:38 +02:00
jschoubben 4d387d2998 Hand the lab design off to mesh-lab
Playbook 04: the design names its owner and flips to in-progress. code
moves from hal to mesh-lab, and decisions gains 0029 and 0030 — the design
now rests on three records rather than one.

repos.md marks mesh-lab as the one target repository that exists. The
other six remain the target, not the present, and saying so is the point:
a map that lists repositories which do not exist is a map that will be
believed.
2026-08-23 22:26:30 +02:00
jschoubben b4904fec7e The lab comes first, and its first scenario has no pipeline
The lab was designed around a module under test, with a scenario being a
complete mesh — forge, coordinator, cascade, verify. That is unusable for
building the new mesh, because all four are tier 2 and do not exist yet.

And research 009 had the sequence backwards. It placed the lab at phase B
as verification of tiers already built, but tier 0 is the component that
takes over a machine's packages, services and network. It cannot be
developed against a machine anyone needs. The lab has to exist before the
thing it will test.

ADR 0029 splits scenarios into two classes. The bootstrap scenario is
virtual machines, the host binary and a pinned bundle, with the verdict
coming from what the host reports about the state it reconciled. The full
scenario is the designed one. The first is a strict subset of the second —
same virtualisation, same networking, same lifecycle, stopping before a
control plane exists — so the second is reached by addition rather than
rework.

The consequence worth having: raising a node from nothing stops being the
least-exercised path in the system and becomes the inner development loop.

It also settles the runner's two jobs. Scenario lifecycle is needed
immediately, because something must materialise and reset a mesh before
anything can be written against it. Assertion execution waits for the full
scenario.

Corrects a stale claim in the design while amending it: it argued
scenarios were affordable with system containers and would not be with
virtual machines. ADR 0016 superseded that reasoning and the text had not
followed.

Issue 007: the lab's first requirement is installed and unusable. The
virtualisation package is present and explicitly installed; both units are
disabled, the operator is in no group, and the client reports the server
unreachable. Not issue 001 again — that is an install failing while
reporting success. This is an install succeeding when success was not the
point. A package is files; a capability is a running service and an
identity permitted to reach it, and the module model has no vocabulary for
the second.
2026-08-23 21:57:14 +02:00
jschoubben 93a1231e00 Retire the HAL name where it points forward
Skills take the hq- prefix: they are HQ process workflows, not mesh
workflows, and HQ is company-scoped now. hq-new-research, hq-graduate,
hq-new-issue, hq-diagnose, hq-amend-design, hq-handoff,
hq-sync-constitution, hq-status.

Forward-looking prose becomes Novox Mesh or simply the mesh — the root
README, AGENTS.md, the 00-META README, the mission's module example, and
one to-be document that addressed 'someone working on HAL'.

Three categories deliberately keep HAL, per ADR 0027:

The monorepo is still called hal on the forge. repos.md, every code: field
and every located-in: field name a repository that exists under that name,
and renaming them in prose would make them false.

The as-is layer and the research that measured it describe the system that
runs, and that system is called HAL. 124 modules, 9 daemons, a dead
containerised node — those are observations, not intentions.

Records 0001-0026 are immutable. A record says what was decided when it
was decided, and no record is edited for a name.

Also repoints ADR 0022's link at the renamed skill — a path fix, which the
immutability rule permits, not a change of meaning.
2026-08-23 21:26:09 +02:00
jschoubben 3f6d939930 Every decision is a record; the ledger is gone
papa-hq has no ledger. Its root is AGENTS.md, CLAUDE.md, README.md, every
decision is a numbered record, and its graduation playbook has no path for
an unrecorded decision. hal-hq now matches.

The ledger's 41 entries classified as: 10 restating a record, 11 restating
design docs, 15 describing how this repository works with the reasoning
sitting in a README rather than anywhere citable, 3 small rules with no
home, 2 superseded stubs. Mostly a copy — and a hand-maintained index, the
exact pattern ADR 0022 had just rejected for the decision index on the
grounds it drifted after one addition. Keeping one copy of that while
removing another is not a position. It also collided by name with
02-DECISIONS/ in any directory listing.

Nothing was dropped. Records 0019-0025 give the repository decisions the
reasoning they never had: HQ is its own repository and is public, design
has two layers, work moves through playbooks, status lives in frontmatter,
issues have a front door, the numbering is the flow, HQ is the source of
the constitution. 0026 records the ledger's own removal.

The three orphan rules went to how-we-build, where a rule is enforced and
keeps the incident that earned it — the package rule was genuinely
unwritten anywhere. Two lab decisions stated only in the ledger went into
the lab design. "Deliberately not decided" went to the research effort and
design document each question actually belongs to.

The chronological view the ledger provided is now generated from record
frontmatter, which is what it was for.

The cost, stated in 0026 rather than glossed: a record is more work than a
table row, so the risk is a small decision going unrecorded because nobody
wanted to write a document. how-we-build takes rules cheaply, which is the
mitigation, not a solution.
2026-08-23 18:17:59 +02:00
jschoubben c0b35652d0 The numbering is the flow: decisions are 02, design is 03
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.

hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.

00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.

Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.
2026-08-23 18:05:11 +02:00