Issue 319: why no walk opened, and four held deliveries closed with stop #237

Merged
mesh-admin merged 1 commits from issues/319-diagnosis-held-deliveries-closed into main 2026-10-08 23:39:03 +00:00
Contributor

This adds a dated entry (2026-10-09) to issue 319's 01-diagnosis.md. It changes nothing else.

  • A new module. The controller builds a new module, sends it nowhere and opens no walk. mesh-delivery's MovesNothing() counts Plan.New as something to move, so the unwalked rule holds the delivery. This is read from the code.
  • The controller's own merges (a guess, not proved). SourceMoved returns without a plan when the modules are "already built from it" or when the merge is read as history. deliveryWalking() links a walk only to the delivery whose merged_as equals the walk's commit, so a later walk never closes an earlier merge's delivery.
  • Four covered deliveries were closed with stop on the operator's word, before this issue was found. Their merged pull requests now carry mesh/delivery = error, "stopped: covered: …". Open D14 conditions went from 11 to 7.
  • The seven still held are listed with why each is held and why it was not stopped.

The four checks pass (records, index, cycle, words). Please do not merge without a person's review.

This adds a dated entry (2026-10-09) to issue 319's `01-diagnosis.md`. It changes nothing else. - **A new module.** The controller builds a new module, sends it nowhere and opens no walk. mesh-delivery's `MovesNothing()` counts `Plan.New` as something to move, so the unwalked rule holds the delivery. This is read from the code. - **The controller's own merges (a guess, not proved).** `SourceMoved` returns without a plan when the modules are "already built from it" or when the merge is read as history. `deliveryWalking()` links a walk only to the delivery whose `merged_as` equals the walk's commit, so a later walk never closes an earlier merge's delivery. - **Four covered deliveries were closed with `stop`** on the operator's word, before this issue was found. Their merged pull requests now carry `mesh/delivery` = error, "stopped: covered: …". Open D14 conditions went from 11 to 7. - **The seven still held** are listed with why each is held and why it was not stopped. The four checks pass (records, index, cycle, words). Please do not merge without a person's review.
mesh-admin added 1 commit 2026-10-08 23:38:10 +00:00
Issue 319: record why no walk opened, and the four held deliveries closed with stop
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
a93ecf90ea
A new module counts as something to move, so its delivery is held; a later walk
reaches only the delivery whose merge is its commit. Four covered deliveries were
stopped before this issue was found, and their merged pull requests now say error.
Author
Contributor

Delivery novox/hq@a93ecf90ea9b — delivered since 2026-10-08T23:39:17Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-08 23:38 (new) → proposed (announced): novox/hq#237's head announced
  • 2026-10-08 23:38 proposed → checked (checked): the verdict names this commit
  • 2026-10-08 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-08 23:39 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-08 23:39 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@a93ecf90ea9b` — **delivered** since 2026-10-08T23:39:17Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-08 23:38 (new) → proposed (announced): novox/hq#237's head announced - 2026-10-08 23:38 proposed → checked (checked): the verdict names this commit - 2026-10-08 23:38 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-08 23:39 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-08 23:39 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-admin merged commit 5b0b550157 into main 2026-10-08 23:39:03 +00:00
mesh-admin deleted branch issues/319-diagnosis-held-deliveries-closed 2026-10-08 23:39:03 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#237