Two catalogue merges 18 seconds apart (2026-10-10, 00:20:52 and 00:21:09 local): the controller heard the later one first, then planned the earlier merge at the later commit (the issue 349 rule) and superseded the first walk. mesh-delivery matches a walk to the delivery merged as its commit, so the surviving walk matched only the already-superseded later delivery, nothing gave it its word, and the earlier delivery was held for a person after ten minutes with a reason naming causes that did not happen. 58 minutes undelivered, no condition raised, released by plans go.
04-ISSUES/362-…/00-report.md, 01-diagnosis.md (trail from the controller's journal and mesh-delivery.show)
Issue 349's report gains a dated sequel pointing at 362 (playbook 03: a fix that broke something else is written back).
Checks: records, index, cycle, words pass locally.
Opens issue 362, status `located`.
Two catalogue merges 18 seconds apart (2026-10-10, 00:20:52 and 00:21:09 local): the controller heard the later one first, then planned the earlier merge at the later commit (the issue 349 rule) and superseded the first walk. mesh-delivery matches a walk to the delivery merged as its commit, so the surviving walk matched only the already-superseded later delivery, nothing gave it its word, and the earlier delivery was held for a person after ten minutes with a reason naming causes that did not happen. 58 minutes undelivered, no condition raised, released by `plans go`.
- `04-ISSUES/362-…/00-report.md`, `01-diagnosis.md` (trail from the controller's journal and `mesh-delivery.show`)
- Issue 349's report gains a dated sequel pointing at 362 (playbook 03: a fix that broke something else is written back).
Checks: records, index, cycle, words pass locally.
Deliverynovox/hq@496452fb5417 — delivered since 2026-10-09T23:33:14Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-09 23:28 (new) → proposed (announced): novox/hq#263's head announced
2026-10-09 23:29 proposed → checked (checked): the verdict names this commit
2026-10-09 23:29 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-09 23:33 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-09 23:33 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@496452fb5417` — **delivered** since 2026-10-09T23:33:14Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-09 23:28 (new) → proposed (announced): novox/hq#263's head announced
- 2026-10-09 23:29 proposed → checked (checked): the verdict names this commit
- 2026-10-09 23:29 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-09 23:33 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-09 23:33 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Opens issue 362, status
located.Two catalogue merges 18 seconds apart (2026-10-10, 00:20:52 and 00:21:09 local): the controller heard the later one first, then planned the earlier merge at the later commit (the issue 349 rule) and superseded the first walk. mesh-delivery matches a walk to the delivery merged as its commit, so the surviving walk matched only the already-superseded later delivery, nothing gave it its word, and the earlier delivery was held for a person after ten minutes with a reason naming causes that did not happen. 58 minutes undelivered, no condition raised, released by
plans go.04-ISSUES/362-…/00-report.md,01-diagnosis.md(trail from the controller's journal andmesh-delivery.show)Checks: records, index, cycle, words pass locally.
Delivery
novox/hq@496452fb5417— delivered since 2026-10-09T23:33:14ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.