This gives novox/hq ADR 0323 its home. The decision is accepted and was approved by the operator today.
To-be 47, The state table: proposed is bounded from when its check is asked, and has no bound while its verdict is out of date and nothing is asked. A new paragraph says that a verdict holds for one trunk commit: ready goes back to proposed on trunk moved, rejected stays rejected, and the guard of proposed → checked counts only a verdict naming the trunk's head, so the table reaches a fixed point. It names the test that holds this.
To-be 47, A delivery group, its Check bullet: each member's head is merged into its own trunk's head and named with that commit. A rebased or pushed member takes its old head's place and is composed again instead of the group being held. A merge into a member's trunk by a pull request that is not a member puts the composed check out of date, and the group reads checking. It names the tests.
To-be 45 §9: a dated "Revision, ADR 0323" paragraph says what the gate judges, what the verdict names, the trunk-move reset, and the merge tool's refusal and ask. It names the replay R341 and the tests.
Glossary: the merge check entry says it judges the merge of the head into a named trunk commit. trunk commit is added, as the record proposes. ADR 0323 is added to Change and delivery's "Decided by".
merge-check.sh passes, with MESH_CATALOG_DIR set: records, index, cycle and words, 154 head words each once.
The code is in mesh-controller, mesh-catalog and mesh-lab on the same branch name, under issue 341.
This gives novox/hq ADR 0323 its home. The decision is accepted and was approved by the operator today.
- **To-be 47, The state table**: `proposed` is bounded from when its check is asked, and has no bound while its verdict is out of date and nothing is asked. A new paragraph says that a verdict holds for one trunk commit: `ready` goes back to `proposed` on `trunk moved`, `rejected` stays `rejected`, and the guard of `proposed` → `checked` counts only a verdict naming the trunk's head, so the table reaches a fixed point. It names the test that holds this.
- **To-be 47, A delivery group, its Check bullet**: each member's head is merged into its own trunk's head and named with that commit. A rebased or pushed member takes its old head's place and is composed again instead of the group being held. A merge into a member's trunk by a pull request that is not a member puts the composed check out of date, and the group reads `checking`. It names the tests.
- **To-be 45 §9**: a dated "Revision, ADR 0323" paragraph says what the gate judges, what the verdict names, the trunk-move reset, and the merge tool's refusal and ask. It names the replay R341 and the tests.
- **Glossary**: the **merge check** entry says it judges the merge of the head into a named trunk commit. **trunk commit** is added, as the record proposes. ADR 0323 is added to Change and delivery's "Decided by".
`merge-check.sh` passes, with `MESH_CATALOG_DIR` set: records, index, cycle and words, 154 head words each once.
The code is in mesh-controller, mesh-catalog and mesh-lab on the same branch name, under issue 341.
A merge check now judges the head merged into a named trunk commit and its
verdict goes out of date when the trunk moves; the designs and the glossary say
so, with the tests that hold it.
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Transitions
2026-10-12 15:46 (new) → proposed (announced): novox/hq#332's head announced
2026-10-12 15:51 proposed → checked (checked): the verdict names this commit
2026-10-12 15:51 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-12 16:11 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-12 16:11 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@09916e2bbc07` — **delivered** since 2026-10-12T16:11:51Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `feat/341-a-merge-check-judges-the-merge`, in order: novox/hq@09916e2bbc07 → novox/mesh-controller@875ebc093e18 → novox/mesh-catalog@41b6e10077ef → novox/mesh-lab@79108a72a0df
- novox/mesh-controller@875ebc093e18 before novox/mesh-catalog@41b6e10077ef: built by
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Transitions**
- 2026-10-12 15:46 (new) → proposed (announced): novox/hq#332's head announced
- 2026-10-12 15:51 proposed → checked (checked): the verdict names this commit
- 2026-10-12 15:51 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-12 16:11 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-12 16:11 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
The review asked that the trunk-less verdicts, mesh-delivery's trunk head, the
refuse-ask race and the lost check's recheck be said, and found the revision
spliced mid-paragraph.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
This gives novox/hq ADR 0323 its home. The decision is accepted and was approved by the operator today.
proposedis bounded from when its check is asked, and has no bound while its verdict is out of date and nothing is asked. A new paragraph says that a verdict holds for one trunk commit:readygoes back toproposedontrunk moved,rejectedstaysrejected, and the guard ofproposed→checkedcounts only a verdict naming the trunk's head, so the table reaches a fixed point. It names the test that holds this.checking. It names the tests.merge-check.shpasses, withMESH_CATALOG_DIRset: records, index, cycle and words, 154 head words each once.The code is in mesh-controller, mesh-catalog and mesh-lab on the same branch name, under issue 341.
Delivery
novox/hq@09916e2bbc07— delivered since 2026-10-12T16:11:51ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
feat/341-a-merge-check-judges-the-merge, in order: novox/hq@09916e2bbc → novox/mesh-controller@875ebc093e → novox/mesh-catalog@41b6e10077 → novox/mesh-lab@79108a72a0Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.