The operator asked (2026-10-16 21:17) for a status update more often, with an overview of the issues being worked on, and for it to be part of the playbook.
Reports every five minutes, every two while a delivery plan runs, and at once when something lands, stops or needs the operator (was every ten minutes).
Clock times come from date, never guessed.
The full layout gains an "Opened along the way" line for issues opened during the feature.
In the session every report is the full layout with the whole issue tree, also when only time passed; the short layout is for a channel.
A playbook edit of a few lines (playbook 08 step 4): the operator's word on this pull request is its review. sh merge-check.sh passes locally. The instruction section how-work-is-done still says "report every ten minutes"; that line follows through issue 951's instruction revision.
The operator asked (2026-10-16 21:17) for a status update more often, with an overview of the issues being worked on, and for it to be part of the playbook.
- Reports every five minutes, every two while a delivery plan runs, and at once when something lands, stops or needs the operator (was every ten minutes).
- Clock times come from `date`, never guessed.
- The full layout gains an "Opened along the way" line for issues opened during the feature.
- In the session every report is the full layout with the whole issue tree, also when only time passed; the short layout is for a channel.
A playbook edit of a few lines (playbook 08 step 4): the operator's word on this pull request is its review. `sh merge-check.sh` passes locally. The instruction section how-work-is-done still says "report every ten minutes"; that line follows through issue 951's instruction revision.
Deliverynovox/hq@fff89b7c6218 — delivered since 2026-10-16T19:34:39Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-16 19:18 (new) → proposed (announced): novox/hq#389's head announced
2026-10-16 19:22 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-16 19:22 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-16 19:34 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-16 19:34 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@fff89b7c6218` — **delivered** since 2026-10-16T19:34:39Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-16 19:18 (new) → proposed (announced): novox/hq#389's head announced
- 2026-10-16 19:22 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-16 19:22 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-16 19:34 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-16 19:34 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Reviewed by operator@novox: the operator approved the playbook 07 edit and its merge into main in the terminal at 21:34 (playbook 08 step 4, ADR 0398). Marked through mesh-delivery.mark-ready (novox/hq issue 913).
ready at fff89b7c62182bc5fe1bb6be51f96257e9304821
Reviewed by operator@novox: the operator approved the playbook 07 edit and its merge into main in the terminal at 21:34 (playbook 08 step 4, ADR 0398). Marked through mesh-delivery.mark-ready (novox/hq issue 913).
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The operator asked (2026-10-16 21:17) for a status update more often, with an overview of the issues being worked on, and for it to be part of the playbook.
date, never guessed.A playbook edit of a few lines (playbook 08 step 4): the operator's word on this pull request is its review.
sh merge-check.shpasses locally. The instruction section how-work-is-done still says "report every ten minutes"; that line follows through issue 951's instruction revision.Delivery
novox/hq@fff89b7c6218— delivered since 2026-10-16T19:34:39ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.ready at
fff89b7c62Reviewed by operator@novox: the operator approved the playbook 07 edit and its merge into main in the terminal at 21:34 (playbook 08 step 4, ADR 0398). Marked through mesh-delivery.mark-ready (novox/hq issue 913).