Design 47: milestone 4 delivered; a fix of milestone 3 comes next. Playbook 07: new integration tests are read against the code before the first push (issues 980, 1082) #415

Merged
mesh-tools merged 2 commits from feat/milestone-4-delivered into main 2026-10-17 22:32:36 +00:00
Member
  • Design 47. Milestone 4's row names the split of issue 980 into 1065-1068 (all delivered and resolved 2026-10-18). A new row "3 fix" (issues 1082, 1049, 1047, 1083, 1084), put after milestone 4 and before milestone 5 by the operator on 2026-10-18, with a sentence on milestone 3's first live group: one Approve held, but it merged in two passes and went out in two delivery plans.
  • Playbook 07. A review step 4: every new integration test is read against the code it drives before the first push, since its first run is otherwise the merge check (2026-10-17: two failed runs, and reading found a third fault). Steps 4-5 renumbered 5-6.

hq's four checks pass locally.

Reviewed-by: review@shanks at c10efa4d8c

- **Design 47.** Milestone 4's row names the split of issue 980 into 1065-1068 (all delivered and resolved 2026-10-18). A new row "3 fix" (issues 1082, 1049, 1047, 1083, 1084), put after milestone 4 and before milestone 5 by the operator on 2026-10-18, with a sentence on milestone 3's first live group: one Approve held, but it merged in two passes and went out in two delivery plans. - **Playbook 07.** A review step 4: every new integration test is read against the code it drives before the first push, since its first run is otherwise the merge check (2026-10-17: two failed runs, and reading found a third fault). Steps 4-5 renumbered 5-6. hq's four checks pass locally. Reviewed-by: review@shanks at c10efa4d8c8f82e10a422544acc4f4716154a041
mesh-tools added 2 commits 2026-10-17 22:31:15 +00:00
Playbook 07: the new test failed on its first two runs, not three
mesh/merge-gate head c10efa4d8c8f merged into trunk be5284f7b86c — pass: the change touches no module of the mesh's graph
mesh/repo-check head c10efa4d8c8f merged into trunk be5284f7b86c — pass: its merge-check.sh passed
mesh/delivery delivered
c10efa4d8c
Author
Member

Delivery novox/hq@c10efa4d8c8f — delivered since 2026-10-17T22:32:38Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-17 22:31 (new) → proposed (announced): novox/hq#415's head announced
  • 2026-10-17 22:31 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-17 22:31 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-17 22:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-17 22:32 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@c10efa4d8c8f` — **delivered** since 2026-10-17T22:32:38Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-17 22:31 (new) → proposed (announced): novox/hq#415's head announced - 2026-10-17 22:31 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-17 22:31 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-17 22:32 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-17 22:32 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 1484ff7682 into main 2026-10-17 22:32:36 +00:00
mesh-tools deleted branch feat/milestone-4-delivered 2026-10-17 22:32:36 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#415