Milestone "3 fix" of design 47 was delivered at 01:47 (mesh-catalog #356). Its row named issue 1084, which the triage closed as a duplicate of 1079; the fix built 1079. The row now names 1079 and the forge module (gitea) it touched, and no longer mesh-controller, which did not change. A one-line design edit: the operator's Approve of its merge is its review (playbook 08 step 4).
Milestone "3 fix" of design 47 was delivered at 01:47 (mesh-catalog #356). Its row named issue 1084, which the triage closed as a duplicate of 1079; the fix built 1079. The row now names 1079 and the forge module (gitea) it touched, and no longer mesh-controller, which did not change. A one-line design edit: the operator's Approve of its merge is its review (playbook 08 step 4).
Reviewed-by: lead-design-47@shanks at b6cf49d8ce12481b4fd696ddaaa535d46924ed85
Deliverynovox/hq@b6cf49d8ce12 — delivered since 2026-10-17T23:51:02Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-17 23:49 (new) → proposed (announced): novox/hq#416's head announced
2026-10-17 23:50 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-17 23:50 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-17 23:51 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-17 23:51 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@b6cf49d8ce12` — **delivered** since 2026-10-17T23:51:02Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-17 23:49 (new) → proposed (announced): novox/hq#416's head announced
- 2026-10-17 23:50 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-17 23:50 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-17 23:51 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-17 23:51 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Milestone "3 fix" of design 47 was delivered at 01:47 (mesh-catalog #356). Its row named issue 1084, which the triage closed as a duplicate of 1079; the fix built 1079. The row now names 1079 and the forge module (gitea) it touched, and no longer mesh-controller, which did not change. A one-line design edit: the operator's Approve of its merge is its review (playbook 08 step 4).
Reviewed-by: lead-design-47@shanks at
b6cf49d8ceDelivery
novox/hq@b6cf49d8ce12— delivered since 2026-10-17T23:51:02ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.