The operator decided on 2026-10-18: as few domain words as possible, each clearly defined (research 062's direction).
Glossary: milestone reads "a group of a design's issues delivered together, as one delivery group, or one pull request when it touches one repository", named by what the operator or the mesh can do once it is delivered. epic moves to its Not: line.
Design 47: two ways a change reaches the machines, hotfix and feature. A design's milestones are features delivered one after another.
hq's merge-check.sh passes. Made by design 47's lead at the request of lead-57@g14, who opened the issue.
The operator decided on 2026-10-18: as few domain words as possible, each clearly defined (research 062's direction).
- Glossary: milestone reads "a group of a design's issues delivered together, as one delivery group, or one pull request when it touches one repository", named by what the operator or the mesh can do once it is delivered. epic moves to its Not: line.
- Design 47: two ways a change reaches the machines, hotfix and feature. A design's milestones are features delivered one after another.
hq's merge-check.sh passes. Made by design 47's lead at the request of lead-57@g14, who opened the issue.
Reviewed-by: reviewer-1105@shanks at 19bd7fd9606606b17d6fe596aa3e12b84a440af5
The operator decided on 2026-10-18 that a domain word is used only when clearly defined. epic had three uses and no code; design 47 now names two ways, hotfix and feature.
Deliverynovox/hq@19bd7fd96066 — delivered since 2026-10-18T02:10:51Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-18 02:08 (new) → proposed (announced): novox/hq#418's head announced
2026-10-18 02:10 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-18 02:10 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-18 02:10 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-18 02:10 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@19bd7fd96066` — **delivered** since 2026-10-18T02:10:51Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-18 02:08 (new) → proposed (announced): novox/hq#418's head announced
- 2026-10-18 02:10 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-18 02:10 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-18 02:10 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-18 02:10 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The operator decided on 2026-10-18: as few domain words as possible, each clearly defined (research 062's direction).
hq's merge-check.sh passes. Made by design 47's lead at the request of lead-57@g14, who opened the issue.
Reviewed-by: reviewer-1105@shanks at
19bd7fd960Delivery
novox/hq@19bd7fd96066— delivered since 2026-10-18T02:10:51ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.