Correct design 47 after the review of #463 #464

Merged
mesh-tools merged 2 commits from design/47-cites-fixes into main 2026-10-21 21:15:05 +00:00
Member

Corrections of design 47: the one-group rule for an SDK change holds from R4e's delivery (ADR 0482 §1, §7); the checker's milestone is one group of four with mesh-sdk a member (ADR 0494, accepted); the Approve is written into a session's wait list only for a pull request with a Waited-by line (ADR 0491 §3, §5; the conflict with ADR 0493 §6 is issue 1787, not resolved here); the R4g row now says mesh-build-image builds images rootless (ADR 0487 §7, issue 1788).

Reviewed-by: reviewer-463@shanks at c07483081d

Corrections of design 47: the one-group rule for an SDK change holds from R4e's delivery (ADR 0482 §1, §7); the checker's milestone is one group of four with mesh-sdk a member (ADR 0494, accepted); the Approve is written into a session's wait list only for a pull request with a Waited-by line (ADR 0491 §3, §5; the conflict with ADR 0493 §6 is issue 1787, not resolved here); the R4g row now says mesh-build-image builds images rootless (ADR 0487 §7, issue 1788). Reviewed-by: reviewer-463@shanks at c07483081db1f20ec0e5a3d472a04b236ec1c42a
mesh-tools added 1 commit 2026-10-21 20:52:22 +00:00
Correct design 47 after review of #463: R4e timing of the SDK group, the wait list's Waited-by condition, and what builds images from R4g
mesh/merge-gate waiting in the build queue since 22:52
mesh/delivery superseded: a newer head of the same pull request
1955d7f624
Author
Member

Delivery novox/hq@c07483081db1 — delivered since 2026-10-21T21:15:06Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-21 20:54 (new) → proposed (announced): novox/hq#464's head announced
  • 2026-10-21 21:00 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-21 21:00 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-21 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-21 21:15 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@c07483081db1` — **delivered** since 2026-10-21T21:15:06Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-21 20:54 (new) → proposed (announced): novox/hq#464's head announced - 2026-10-21 21:00 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-21 21:00 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-21 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-21 21:15 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
jschoubben added 1 commit 2026-10-21 20:54:19 +00:00
Cite ADR 0494 in design 47: the checker's milestone is one group, not two deliveries
mesh/merge-gate head c07483081db1 merged into trunk 57396112c7ab — pass: the change touches no module of the mesh's graph
mesh/repo-check head c07483081db1 merged into trunk 57396112c7ab — pass: its merge-check.sh passed
mesh/delivery delivered
c07483081d
mesh-tools merged commit 73a06324dc into main 2026-10-21 21:15:05 +00:00
mesh-tools deleted branch design/47-cites-fixes 2026-10-21 21:15:05 +00:00
Sign in to join this conversation.
No Reviewers
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#464