Corrections of design 47: the one-group rule for an SDK change holds from R4e's delivery (ADR 0482 §1, §7); the checker's milestone is one group of four with mesh-sdk a member (ADR 0494, accepted); the Approve is written into a session's wait list only for a pull request with a Waited-by line (ADR 0491 §3, §5; the conflict with ADR 0493 §6 is issue 1787, not resolved here); the R4g row now says mesh-build-image builds images rootless (ADR 0487 §7, issue 1788).
Corrections of design 47: the one-group rule for an SDK change holds from R4e's delivery (ADR 0482 §1, §7); the checker's milestone is one group of four with mesh-sdk a member (ADR 0494, accepted); the Approve is written into a session's wait list only for a pull request with a Waited-by line (ADR 0491 §3, §5; the conflict with ADR 0493 §6 is issue 1787, not resolved here); the R4g row now says mesh-build-image builds images rootless (ADR 0487 §7, issue 1788).
Reviewed-by: reviewer-463@shanks at c07483081db1f20ec0e5a3d472a04b236ec1c42a
Deliverynovox/hq@c07483081db1 — delivered since 2026-10-21T21:15:06Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-21 20:54 (new) → proposed (announced): novox/hq#464's head announced
2026-10-21 21:00 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-21 21:00 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-21 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-21 21:15 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@c07483081db1` — **delivered** since 2026-10-21T21:15:06Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-21 20:54 (new) → proposed (announced): novox/hq#464's head announced
- 2026-10-21 21:00 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-21 21:00 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-21 21:15 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-21 21:15 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Corrections of design 47: the one-group rule for an SDK change holds from R4e's delivery (ADR 0482 §1, §7); the checker's milestone is one group of four with mesh-sdk a member (ADR 0494, accepted); the Approve is written into a session's wait list only for a pull request with a Waited-by line (ADR 0491 §3, §5; the conflict with ADR 0493 §6 is issue 1787, not resolved here); the R4g row now says mesh-build-image builds images rootless (ADR 0487 §7, issue 1788).
Reviewed-by: reviewer-463@shanks at
c07483081dDelivery
novox/hq@c07483081db1— delivered since 2026-10-21T21:15:06ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.