Name the session that pushed a head in its pull request (ADR 0505 §5) #466

Merged
mesh-tools merged 1 commits from feat/quiet-deliveries into main 2026-10-22 14:01:16 +00:00
Member

Delivery group feat/quiet-deliveries (ADR 0505, problem messages during deliveries): mesh-controller, mesh-catalog and hq.

Playbooks 07 and 08 (and the drawn overview) add a Pushed-by: <who@node> line to a pull request's description, so a head that needs a new one after the Approve names its author (ADR 0505 §5).

Reviewed-by: reviewer-0505@shanks at 9a74de0bd6
Pushed-by: lead-47@shanks

Delivery group `feat/quiet-deliveries` (ADR 0505, problem messages during deliveries): mesh-controller, mesh-catalog and hq. Playbooks 07 and 08 (and the drawn overview) add a `Pushed-by: <who@node>` line to a pull request's description, so a head that needs a new one after the Approve names its author (ADR 0505 §5). Reviewed-by: reviewer-0505@shanks at 9a74de0bd64f106212b36fd72e776c30c1fd2e03 Pushed-by: lead-47@shanks
mesh-tools added 1 commit 2026-10-22 13:13:02 +00:00
Name the session that pushed a head in its pull request, so a head that needs a new one names its author (ADR 0505 §5)
mesh/repo-check head 9a74de0bd64f merged into trunk 77d4a8a39e1f beside mesh-catalog#444@09e749bc +1 more — pass: its merge-check.sh passed
mesh/merge-gate head 9a74de0bd64f merged into trunk 77d4a8a39e1f — pass: group feat/quiet-deliveries composed: every machine composes with the change as it…
mesh/delivery delivered
mesh/delivery-group group feat/quiet-deliveries delivered: every member is delivered
9a74de0bd6
Author
Member

Delivery novox/hq@9a74de0bd64f — delivered since 2026-10-22T14:01:18Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Group feat/quiet-deliveries: novox/hq@9a74de0bd6, novox/mesh-catalog@09e749bc1a, novox/mesh-controller@b7d03b6897

  • composed together: pass — every machine composes with the change as it did without (4 of 4 compose)

Transitions

  • 2026-10-22 13:13 (new) → proposed (announced): novox/hq#466's head announced
  • 2026-10-22 13:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-22 13:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-22 14:01 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-22 14:01 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@9a74de0bd64f` — **delivered** since 2026-10-22T14:01:18Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Group** `feat/quiet-deliveries`: novox/hq@9a74de0bd64f, novox/mesh-catalog@09e749bc1a1c, novox/mesh-controller@b7d03b68974d - composed together: pass — every machine composes with the change as it did without (4 of 4 compose) **Transitions** - 2026-10-22 13:13 (new) → proposed (announced): novox/hq#466's head announced - 2026-10-22 13:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-22 13:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-22 14:01 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-22 14:01 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 58555ec330 into main 2026-10-22 14:01:16 +00:00
mesh-tools deleted branch feat/quiet-deliveries 2026-10-22 14:01:17 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#466