Delivery group feat/quiet-deliveries (ADR 0505, problem messages during deliveries): mesh-controller, mesh-catalog and hq.
Playbooks 07 and 08 (and the drawn overview) add a Pushed-by: <who@node> line to a pull request's description, so a head that needs a new one after the Approve names its author (ADR 0505 §5).
Reviewed-by: reviewer-0505@shanks at 9a74de0bd6
Pushed-by: lead-47@shanks
Delivery group `feat/quiet-deliveries` (ADR 0505, problem messages during deliveries): mesh-controller, mesh-catalog and hq.
Playbooks 07 and 08 (and the drawn overview) add a `Pushed-by: <who@node>` line to a pull request's description, so a head that needs a new one after the Approve names its author (ADR 0505 §5).
Reviewed-by: reviewer-0505@shanks at 9a74de0bd64f106212b36fd72e776c30c1fd2e03
Pushed-by: lead-47@shanks
mesh/merge-gate head 9a74de0bd64f merged into trunk 77d4a8a39e1f — pass: group feat/quiet-deliveries composed: every machine composes with the change as it…
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Transitions
2026-10-22 13:13 (new) → proposed (announced): novox/hq#466's head announced
2026-10-22 13:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-22 13:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-22 14:01 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-22 14:01 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@9a74de0bd64f` — **delivered** since 2026-10-22T14:01:18Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `feat/quiet-deliveries`: novox/hq@9a74de0bd64f, novox/mesh-catalog@09e749bc1a1c, novox/mesh-controller@b7d03b68974d
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Transitions**
- 2026-10-22 13:13 (new) → proposed (announced): novox/hq#466's head announced
- 2026-10-22 13:32 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-22 13:32 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-22 14:01 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-22 14:01 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Delivery group
feat/quiet-deliveries(ADR 0505, problem messages during deliveries): mesh-controller, mesh-catalog and hq.Playbooks 07 and 08 (and the drawn overview) add a
Pushed-by: <who@node>line to a pull request's description, so a head that needs a new one after the Approve names its author (ADR 0505 §5).Reviewed-by: reviewer-0505@shanks at
9a74de0bd6Pushed-by: lead-47@shanks
Delivery
novox/hq@9a74de0bd64f— delivered since 2026-10-22T14:01:18ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
feat/quiet-deliveries: novox/hq@9a74de0bd6, novox/mesh-catalog@09e749bc1a, novox/mesh-controller@b7d03b6897Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.