Design 63 (the mail web UI with mail reading and Owly) and playbook 10 (visual design) #469

Merged
mesh-tools merged 3 commits from design-63-mail-web-ui into main 2026-10-22 18:16:54 +00:00
Member

Issues 1855 and 1856.

  • Design 63: the mail page becomes the operator's list with Owly beside it (ADR 0515 to ADR 0519), in six milestones with their issues; milestones 2, 4 and 6 and the teaching in milestone 5 are marked proposed scope until their decisions. The reference mockup is kept beside it in 63-mockup/, with every name, address, employer, domain, provider and amount invented.
  • Playbook 10, visual design: mockups with fixed data, the operator picks, the pick is the reference; listed in the overview and the drawn playbooks page.
  • As-is 18 now describes mail reading as delivered (read from mesh-catalog origin/main 835bf22b).
  • Design 59 says where design 63 replaces it (its page, its milestone 4 and section 8) and lists ADR 0515 and ADR 0518.
  • Glossary: the operator's list, task, promise, read later, handled, action log, Owly, morning briefing, suggested action, approval inbox.
  • AGENTS.md: a design may keep its reference mockup as HTML (the operator, 2026-10-22).

sh merge-check.sh passes; mesh-controller.try build-1792689763112376301 passed at 030e9856.

Reviewed-by: reviewer-d63@g14 at 030e985694
Pushed-by: lead-m2@g14

Issues 1855 and 1856. - **Design 63**: the mail page becomes the operator's list with Owly beside it (ADR 0515 to ADR 0519), in six milestones with their issues; milestones 2, 4 and 6 and the teaching in milestone 5 are marked proposed scope until their decisions. The reference mockup is kept beside it in `63-mockup/`, with every name, address, employer, domain, provider and amount invented. - **Playbook 10, visual design**: mockups with fixed data, the operator picks, the pick is the reference; listed in the overview and the drawn playbooks page. - **As-is 18** now describes mail reading as delivered (read from mesh-catalog origin/main 835bf22b). - **Design 59** says where design 63 replaces it (its page, its milestone 4 and section 8) and lists ADR 0515 and ADR 0518. - **Glossary**: the operator's list, task, promise, read later, handled, action log, Owly, morning briefing, suggested action, approval inbox. - **AGENTS.md**: a design may keep its reference mockup as HTML (the operator, 2026-10-22). `sh merge-check.sh` passes; `mesh-controller.try` build-1792689763112376301 passed at 030e9856. Reviewed-by: reviewer-d63@g14 at 030e9856940d57c4ec7b782910176b5430553e38 Pushed-by: lead-m2@g14
mesh-tools added 3 commits 2026-10-22 17:27:46 +00:00
Design 63 turns the mail page into the operator's list with Owly beside it (ADR 0515
to 0519), in six milestones with their issues; its reference mockup is kept beside it,
its data invented. Playbook 10 says how a page is designed before it is built: mockups
with fixed data, the operator picks, the pick is the reference. The as-is of the mail
modules now describes mail reading as delivered, the glossary gains design 63's words,
design 59's milestone 4 is marked replaced, and AGENTS.md allows a design's mockup.

Issues 1855 and 1856.
Answer the review's second round: the mockup's sheet holds invented sales figures; milestone 5's row lists only teaching and the counts
mesh/merge-gate head 030e9856940d merged into trunk 58555ec33074 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 030e9856940d merged into trunk 58555ec33074 — pass: its merge-check.sh passed
mesh/delivery delivered
030e985694
Author
Member

Delivery novox/hq@030e9856940d — delivered since 2026-10-22T18:16:56Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Transitions

  • 2026-10-22 17:27 (new) → proposed (announced): novox/hq#469's head announced
  • 2026-10-22 17:28 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
  • 2026-10-22 17:28 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-22 18:16 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-22 18:16 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@030e9856940d` — **delivered** since 2026-10-22T18:16:56Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Transitions** - 2026-10-22 17:27 (new) → proposed (announced): novox/hq#469's head announced - 2026-10-22 17:28 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit - 2026-10-22 17:28 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-22 18:16 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-22 18:16 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-tools merged commit 795b3b5d45 into main 2026-10-22 18:16:54 +00:00
mesh-tools deleted branch design-63-mail-web-ui 2026-10-22 18:16:55 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#469