Design 47's milestone table names each issue once, and design 53 says milestones are records (issue 1781) #483

Merged
mesh-tools merged 3 commits from feat/1781-milestone-records into main 2026-10-26 18:06:44 +00:00
Member

Issue 1781. Delivery group with novox/mesh-catalog feat/1781-milestone-records.

  • Design 47's milestone table: each issue in one row (the last row keeps an issue two rows named), R4a's range written out as numbers, row M1 for issue 1781, and the reasons recorded.
  • Design 53 §13 (milestones), with ADR 0493 in its decisions: a milestone is a record in the issue tracker; the seed's close rule matches the code (done is wontfix, resolved with every live fix delivered, or resolved with no live fix; closed only when none of its row's issues was refused).

Try: try-1793036454148355540 passed at ebc1a84e.

Reviewed-by: review-1781@shanks at ebc1a84e59

Issue 1781. Delivery group with novox/mesh-catalog feat/1781-milestone-records. - Design 47's milestone table: each issue in one row (the last row keeps an issue two rows named), R4a's range written out as numbers, row M1 for issue 1781, and the reasons recorded. - Design 53 §13 (milestones), with ADR 0493 in its decisions: a milestone is a record in the issue tracker; the seed's close rule matches the code (done is wontfix, resolved with every live fix delivered, or resolved with no live fix; closed only when none of its row's issues was refused). Try: try-1793036454148355540 passed at ebc1a84e. Reviewed-by: review-1781@shanks at ebc1a84e592e49ab2d55050a7f0b91de9e7d44e5
mesh-tools added 3 commits 2026-10-26 18:05:10 +00:00
Author
Member

Delivery novox/hq@ebc1a84e592e — merged since 2026-10-26T18:06:47Z

Source — source.main moved to novox/hq@d698942b1d. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Group feat/1781-milestone-records: novox/hq@ebc1a84e59, novox/mesh-catalog@76e4ec4dc6

Transitions

  • 2026-10-26 18:05 (new) → proposed (announced): novox/hq#483's head announced
  • 2026-10-26 18:05 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-26 18:06 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@ebc1a84e592e` — **merged** since 2026-10-26T18:06:47Z **Source** — source.main moved to novox/hq@d698942b1d56. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Group** `feat/1781-milestone-records`: novox/hq@ebc1a84e592e, novox/mesh-catalog@76e4ec4dc680 **Transitions** - 2026-10-26 18:05 (new) → proposed (announced): novox/hq#483's head announced - 2026-10-26 18:05 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-26 18:06 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit d698942b1d into main 2026-10-26 18:06:44 +00:00
mesh-tools deleted branch feat/1781-milestone-records 2026-10-26 18:06:45 +00:00
Sign in to join this conversation.