Playbooks 07 and 08: one release, one check, no try, push once after the review (ADR 0548) #484

Merged
mesh-tools merged 2 commits from pb/one-check-per-release into main 2026-10-26 19:55:30 +00:00
Member

The operator, 2026-10-26: "every release should only run 1 check or 1 try"; "we don't have more processing power". The instruction section how-work-is-done was replaced on the operator's Approve (20:47 CET); this makes the playbooks say the same: no try (unless the operator asks), nothing pushed and no pull request (draft or not) before the review approves, no fix rounds pushed to an open pull request, a group is one check with every member pinning the group's mesh-sdk head, a failed check is read and never re-asked, and read what is decided before designing (ADR 0548). playbooks.html follows (the try box and bar removed; the check is one status, mesh/check).

Quick fix: change only the instruction section. Thorough fix (chosen): the playbooks too, since sessions follow them.

go test ./... at the root passes.

Reviewed-by: review-pb@shanks at 1dab64134a

The operator, 2026-10-26: "every release should only run 1 check or 1 try"; "we don't have more processing power". The instruction section how-work-is-done was replaced on the operator's Approve (20:47 CET); this makes the playbooks say the same: no try (unless the operator asks), nothing pushed and no pull request (draft or not) before the review approves, no fix rounds pushed to an open pull request, a group is one check with every member pinning the group's mesh-sdk head, a failed check is read and never re-asked, and read what is decided before designing (ADR 0548). playbooks.html follows (the try box and bar removed; the check is one status, mesh/check). Quick fix: change only the instruction section. Thorough fix (chosen): the playbooks too, since sessions follow them. `go test ./...` at the root passes. Reviewed-by: review-pb@shanks at 1dab64134a563a71d668030ca3986dd55e64c30e
mesh-tools added 2 commits 2026-10-26 19:53:09 +00:00
Build capacity is the mesh's scarcest resource: a try before and after the review plus a check per fix round on an open pull request spent it several times per release.
Playbooks 07 and 08: the one check is one status, mesh/check; drop the leftover try wording (review fixes)
mesh/delivery merged: source.main moved to novox/hq@278ca42b3df2
mesh/check pass 1dab64134a56 on 132aae843383 | unit 39 run, 0 kept, 1 skipped | integration 39 run, 0 kept, 1 skipped | composition passed
1dab64134a
Author
Member

Delivery novox/hq@1dab64134a56 — merged since 2026-10-26T19:55:31Z

Source — source.main moved to novox/hq@278ca42b3d. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Transitions

  • 2026-10-26 19:53 (new) → proposed (announced): novox/hq#484's head announced
  • 2026-10-26 19:53 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-10-26 19:55 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@1dab64134a56` — **merged** since 2026-10-26T19:55:31Z **Source** — source.main moved to novox/hq@278ca42b3df2. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Transitions** - 2026-10-26 19:53 (new) → proposed (announced): novox/hq#484's head announced - 2026-10-26 19:53 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-10-26 19:55 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 278ca42b3d into main 2026-10-26 19:55:30 +00:00
mesh-tools deleted branch pb/one-check-per-release 2026-10-26 19:55:30 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#484