Delivery 2 of design 47's single release (group feat/774-l3-reland). Glossary: artifact sweep, build log, seat holders, node health report, disk readings; the hand-act log's form; membership's state. Design 47: frontmatter cites ADR 0563, 0570, 0571, 0572; rows L3, L4, L6, L7 and their passages say what was built. go test ./... passes.
Delivery 2 of design 47's single release (group feat/774-l3-reland). Glossary: artifact sweep, build log, seat holders, node health report, disk readings; the hand-act log's form; membership's state. Design 47: frontmatter cites ADR 0563, 0570, 0571, 0572; rows L3, L4, L6, L7 and their passages say what was built. `go test ./...` passes.
Reviewed-by: rev-47@shanks at 0c450cad258edee5cc258b4731a2c2a0374b4b47
Deliverynovox/hq@0c450cad258e — merged since 2026-10-30T11:01:46Z
Source — source.main moved to novox/hq@1747485cb3. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.
2026-10-30 00:22 (new) → proposed (announced): novox/hq#496's head announced
2026-10-30 00:22 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
2026-10-30 11:01 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@0c450cad258e` — **merged** since 2026-10-30T11:01:46Z
**Source** — source.main moved to novox/hq@1747485cb351. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves.
**Group** `feat/774-l3-reland`: novox/hq@0c450cad258e, novox/mesh-catalog@f3a57dcc56fb, novox/mesh-controller@8b32e04e2f8b, novox/mesh-delivery@8edc83950cea, novox/mesh-host@015334020ad2, novox/mesh-sdk@2da0de75c3f0, novox/mesh-tools@250aa73a5631
**Transitions**
- 2026-10-30 00:22 (new) → proposed (announced): novox/hq#496's head announced
- 2026-10-30 00:22 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
- 2026-10-30 11:01 ready → merged (merged): on the trunk its modules follow: merged there
The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: not merged. The merge of this pull request into main at 0c450cad25 was declined: the operator, via telegram (user id verified), chose Decline. A new head asks the operator again.
mesh-delivery: **not merged.** The merge of this pull request into main at 0c450cad258edee5cc258b4731a2c2a0374b4b47 was declined: the operator, via telegram (user id verified), chose Decline. A new head asks the operator again.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Delivery 2 of design 47's single release (group feat/774-l3-reland). Glossary: artifact sweep, build log, seat holders, node health report, disk readings; the hand-act log's form; membership's state. Design 47: frontmatter cites ADR 0563, 0570, 0571, 0572; rows L3, L4, L6, L7 and their passages say what was built.
go test ./...passes.Reviewed-by: rev-47@shanks at
0c450cad25Delivery
novox/hq@0c450cad258e— merged since 2026-10-30T11:01:46ZSource — source.main moved to novox/hq@1747485cb3. Whether it reached the machines is
mesh-delivery-view's, derived fromsource.main, the wants and the haves.Group
feat/774-l3-reland: novox/hq@0c450cad25, novox/mesh-catalog@f3a57dcc56, novox/mesh-controller@8b32e04e2f, novox/mesh-delivery@8edc83950c, novox/mesh-host@015334020a, novox/mesh-sdk@2da0de75c3, novox/mesh-tools@250aa73a56Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition of this change up to its merge:git log --notes=mesh-plan.mesh-delivery: the operator's Approve of this pull request's merge into main is ended: a head it covers moved on: the heads it covers are no longer the group's heads. Nothing is merged on it. The operator is asked again once the checks pass at the new head.
mesh-delivery: not merged. The merge of this pull request into main at
0c450cad25was declined: the operator, via telegram (user id verified), chose Decline. A new head asks the operator again.