Design 39 bus-and-switch: the lead's answers to the prepare's 22 questions #558

Merged
mesh-tools merged 1 commits from design/39-licence-answers into main 2026-11-11 22:00:34 +00:00
Member

Issue 1409. The prepare of design 39 bus-and-switch (build map hq/.work/39-licence/) found 22 design questions; the lead answers each in one line by 00-META/principles.md (B1-B22), as the operator's way of working since 2026-11-11 21:15 says. B1 makes mesh-contracts a second member of the milestone's delivery group (the vault's seat gains licence-put).

Checks: go test ./... at hq's root passes.

Pushed-by: fix-1965@shanks

https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ

Issue 1409. The prepare of design 39 bus-and-switch (build map hq/.work/39-licence/) found 22 design questions; the lead answers each in one line by `00-META/principles.md` (B1-B22), as the operator's way of working since 2026-11-11 21:15 says. B1 makes mesh-contracts a second member of the milestone's delivery group (the vault's seat gains `licence-put`). Checks: `go test ./...` at hq's root passes. Pushed-by: fix-1965@shanks https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ
mesh-tools added 1 commit 2026-11-11 21:50:49 +00:00
Design 39 bus-and-switch: the lead's answers to the prepare's 22 questions, each by the principles
mesh/check being carried to 2bf174b57c57 on 173d6d2cd45d | from 18639c73921a
mesh/delivery merged: source.main moved to novox/hq@173d6d2cd45d
2bf174b57c
Claude-Session: https://claude.ai/code/session_01NcbgfHb9d4T9nq5Q6WqdiJ
Author
Member

Delivery novox/hq@2bf174b57c57 — merged since 2026-11-11T22:00:35Z

Source — source.main moved to novox/hq@173d6d2cd4. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Transitions

  • 2026-11-11 21:50 (new) → proposed (announced): novox/hq#558's head announced
  • 2026-11-11 21:50 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-11 22:00 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@2bf174b57c57` — **merged** since 2026-11-11T22:00:35Z **Source** — source.main moved to novox/hq@173d6d2cd45d. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Transitions** - 2026-11-11 21:50 (new) → proposed (announced): novox/hq#558's head announced - 2026-11-11 21:50 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-11 22:00 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit 173d6d2cd4 into main 2026-11-11 22:00:34 +00:00
mesh-tools deleted branch design/39-licence-answers 2026-11-11 22:00:34 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#558