Design 47 G: the lead's answers A-339 to A-342, met merging the zfs group into G #602

Merged
mesh-tools merged 4 commits from design/47-G-lead-answers-27 into main 2026-11-13 08:54:30 +00:00
Member

The lead's answers to the design questions met while merging the zfs group (issue 1979, design 42) into milestone G, each tested against 00-META/principles.md:

  • A-339: zfs's findings take G's generated writer over its keeper; the keeper's closed list gains only what that writer needs.
  • A-340: a process's bus may name, under consumes, an event its module consumes; validator and grants follow as for requires (V5, G1). The writer's three events.
  • A-341: a zfs device's finding in the writer's key form (scope module, id zfs.., kind not-online).
  • A-342: the node-engine sets MESH_NODE for every process it runs; a resource's own MESH_NODE is refused.

The root checks pass.

https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h

The lead's answers to the design questions met while merging the zfs group (issue 1979, design 42) into milestone G, each tested against `00-META/principles.md`: - A-339: zfs's findings take G's generated writer over its keeper; the keeper's closed list gains only what that writer needs. - A-340: a process's `bus` may name, under `consumes`, an event its module consumes; validator and grants follow as for `requires` (V5, G1). The writer's three events. - A-341: a zfs device's finding in the writer's key form (scope module, id zfs.<pool>.<device>, kind not-online). - A-342: the node-engine sets MESH_NODE for every process it runs; a resource's own MESH_NODE is refused. The root checks pass. https://claude.ai/code/session_01NcbgfGKaxw984XyAPfLm4h
mesh-tools added 4 commits 2026-11-13 08:36:15 +00:00
Author
Member

Delivery novox/hq@14b5b324a258 — merged since 2026-11-13T08:54:36Z

Source — source.main moved to novox/hq@dc76022e04. Whether it reached the machines is mesh-delivery-view's, derived from source.main, the wants and the haves.

Transitions

  • 2026-11-13 08:36 (new) → proposed (announced): novox/hq#602's head announced
  • 2026-11-13 08:36 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false)
  • 2026-11-13 08:54 ready → merged (merged): on the trunk its modules follow: merged there

The commit's note under refs/notes/mesh-plan keeps every transition of this change up to its merge: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@14b5b324a258` — **merged** since 2026-11-13T08:54:36Z **Source** — source.main moved to novox/hq@dc76022e04b8. Whether it reached the machines is `mesh-delivery-view`'s, derived from `source.main`, the wants and the haves. **Transitions** - 2026-11-13 08:36 (new) → proposed (announced): novox/hq#602's head announced - 2026-11-13 08:36 proposed → ready (accepted): a verdict names this commit and the trunk's head as its trunk commit, the gate passed or warned, and the repository's own check did not fail; or the check gates no merge (check-gates-merge false) - 2026-11-13 08:54 ready → merged (merged): on the trunk its modules follow: merged there The commit's note under `refs/notes/mesh-plan` keeps every transition of this change up to its merge: `git log --notes=mesh-plan`.
mesh-tools merged commit dc76022e04 into main 2026-11-13 08:54:30 +00:00
mesh-tools deleted branch design/47-G-lead-answers-27 2026-11-13 08:54:31 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#602