Reconcile: adopt initialization's consolidated HQ as canonical, re-home this session's new work #24
@@ -0,0 +1,42 @@
|
||||
---
|
||||
status: open
|
||||
opened: 2026-09-02
|
||||
located-in: [mesh-host]
|
||||
fixed-by:
|
||||
amended-design:
|
||||
---
|
||||
|
||||
# 031 — A machine becomes each thing it was told, in turn
|
||||
|
||||
## Symptom
|
||||
|
||||
A machine that was pushed several declarations in quick succession applies every one of them,
|
||||
oldest first, at the better part of a minute each. Under the lab's suite — twenty-odd pushes in
|
||||
fifteen minutes — the anchor machine ran minutes behind the newest declaration, and a test that
|
||||
waited for it honestly timed out while the machine was busy becoming things nobody wanted any
|
||||
more.
|
||||
|
||||
Only visible since caught-up became an equality: each report now names the declaration it applied,
|
||||
and the reports arriving were about ever-older ones. Before that, the same backlog hid inside
|
||||
timestamp comparisons that happened to pass.
|
||||
|
||||
## Why it is wrong, and why it is also right
|
||||
|
||||
Each declaration is complete — the whole machine, not a delta — so applying an old one is never
|
||||
*incorrect*, only wasted: the machine converges to a state the mesh has already moved past, then
|
||||
does it again. The queue keeps a disconnected machine's instructions safe, which is right. What
|
||||
is wrong is only the order of consumption: **a machine asked to be five successive things should
|
||||
become the last one.**
|
||||
|
||||
## The shape of a fix
|
||||
|
||||
On waking with a queue, drain it and apply only the newest declaration; acknowledge the
|
||||
superseded ones without applying them. Whether a superseded declaration deserves a report — and
|
||||
what its outcome should be called — is the real question for the link's vocabulary: silence reads
|
||||
as a machine that ignored an instruction, and "applied" would be a lie.
|
||||
|
||||
## What it costs today
|
||||
|
||||
Nothing on a real mesh at rest: pushes are far apart. It costs the lab about a doubling of one
|
||||
test's wait, and it will cost a real mesh exactly when things are busiest — a flurry of changes is
|
||||
when a machine can least afford to replay history.
|
||||
Reference in New Issue
Block a user