jschoubben 09489a298c ADR 0030: the repository structure, and the rule that names them
The tiers were settled and the product was named, but the repositories
themselves existed only in a research sketch. That had already caused two
problems.

ADR 0029 makes the lab phase 0 of the migration and could not say where it
lives, because no record named a repository.

And the sketch contradicted an accepted record: it listed mesh-hq while
ADR 0028 had decided novox/hq and explicitly rejected that name. A design
resting on research is resting on something that can change without a
decision. Corrected in the research too.

The naming rule, which both earlier records implied and neither stated: a
repository belonging to a product carries that product's prefix; a
company-scoped one does not. That is why this repository is hq and the
mesh's are mesh-*.

Seven repositories recorded — host, substrate, control, surfaces, sdk, lab,
and this one. The lab gets its own: it ships to nobody, outlives any single
tier, and drives virtualisation on a workstation, which nothing else does.
Inside the host it would couple development tooling to a shipped
component; inside the control plane the bootstrap scenario would depend on
a tier that does not exist when it is needed.

Tier 4 is deliberately not decided. Whether the catalogue is one
repository, one per domain or one per application stays open from ADR 0015
and is blocked on research 005 — how many repositories hold domains cannot
be answered before knowing what the domains are. mesh-catalog appears in
the sketch and is not decided by this record.

The cost is stated rather than glossed: seven release cadences where there
is one, and cross-repository changes that used to be one commit.
2026-08-23 22:04:04 +02:00
..

01-RESEARCH

Investigations that have not yet hardened into design.

Structure

Each effort lives in NNN-descriptive-name/ and must contain 00-overview.md, carrying its state in YAML frontmatter and a prose summary below it:

---
status: active | graduated | abandoned
initiated: YYYY-MM-DD
touches: []          # design docs, subsystems or areas the effort bears on
became: []           # required when status is terminal — what it turned into
---

The prose says what is being investigated, why, and what it touches. It does not restate the status — status lives in one place, and two places is one too many.

Further documents in the same folder hold the work itself: notes, evidence, option analyses, draft designs.

Lifecycle

status Meaning
active Investigation in progress.
graduated Checked against 00-META, decided in 02-DECISIONS/, and specified in 03-DESIGN — see became:.
abandoned Stopped or superseded. Nothing is deleted.

An effort graduates by producing a decision record and a 03-DESIGN entry. It is abandoned in place — never deleted. What was rejected, and why, is the more expensive half to rediscover.

Starting and closing efforts is playbook territory: 00-META/process/01-research.md and 02-graduation.md.

Rules

  • Markdown only. Do not skip or reuse a sequence number.
  • Evidence, not assertion. An effort that measured nothing has not finished.
  • Research describes real observations but never identifies the mesh it observed. The shape of a finding survives anonymisation intact.