Jochen asked whether the order made sense. It did not -- it followed when things happened to be decided, which after consolidation is fictional anyway since record 5 alone folds decisions taken across a week. Concretely wrong before: the domain statement sat at 8, after five engineering rules; the constitution was scattered across 5, 12 and 17; the tiers landed at 15, 16, 21 and 22 with process records in between. Now it walks: what the mesh is (1-3), its tiers from the bottom up (4-8), what runs on them and how it gets there (9-10), how it is built (11-16), how it is checked (17-18), how we work (19-23). Two things made this safe rather than free. It is a permutation, not a compaction, so the renames go through temporary names -- otherwise two files want one slot and one is lost. And the reference rewrite is a single simultaneous pass, because almost every number moved into a slot another number was vacating; replacing one at a time would have cascaded and pointed things at the wrong record while still resolving. Verified: 284 [ADR NNNN](path) links across the repository, all with matching text and target. The ordering principle is now stated in 19 rather than left implicit -- the repository already said "the numbering is the flow" about its folders, and there was no reason for the records to be the exception.
03-DESIGN / 01-to-be
The mesh being built toward. Every statement here traces to a record in
02-DECISIONS/; nothing arrives by drafting.
A document here describes an intention. What currently runs is in
00-as-is/, and the two are never merged — when something ships, the as-is
document is written and this one's status becomes implemented.
| Document | Covers | Rests on |
|---|---|---|
00-work-breakdown.md |
How the decomposition gets built, in what order, and where a human must look | ADR 0001 |
01-end-to-end-testing.md |
The lab: a real mesh a change can be run against before it reaches nodes | ADR 0016, 0029 |
02-scenario-declaration.md |
What a scenario declares — the underlay, and what to place on it | ADR 0016 |
03-scenario-lifecycle.md |
What happens to a scenario — raise, snapshot, restore, move, destroy | ADR 0016 |
04-lab-installation.md |
Getting the lab onto a clean machine, and why it verifies capability rather than installation | ADR 0010 |
05-the-node-host.md |
Tier 0 — the one thing installed by hand, and the only thing that changes a machine | ADR 0005 |
06-the-control-plane.md |
Tier 2 — what the term means, and the test for what belongs in it | ADR 0005 |
07-the-substrate.md |
Tier 1 — what the control plane consumes and cannot grant itself | ADR 0004, 0048 |
08-connectivity.md |
One context in full — overlay, resolution, exposure, filtering, certificates | ADR 0007, 0050, 0051, 0055 |
09-the-node-lifecycle.md |
How a machine becomes a node, stays one, and stops being one | ADR 0004, 0051 |
10-delivery.md |
Modules, the three edges, and how a change becomes a running thing | ADR 0010, 0064, 0065 |
Not yet written
- The remaining six contexts.
ADR 0006
settles the list at seven;
connectivityis the first written in full (08) and the other six do not exist yet. The work breakdown says in what order they are needed. Domain grouping outside the core.Not needed. ADR 0009 is superseded by ADR 0009: there is no domain module to group into, so there is no domain list to settle. Relationships are edges, and grouping is a tag and a query.