The tiers were settled and the product was named, but the repositories themselves existed only in a research sketch. That had already caused two problems. ADR 0029 makes the lab phase 0 of the migration and could not say where it lives, because no record named a repository. And the sketch contradicted an accepted record: it listed mesh-hq while ADR 0028 had decided novox/hq and explicitly rejected that name. A design resting on research is resting on something that can change without a decision. Corrected in the research too. The naming rule, which both earlier records implied and neither stated: a repository belonging to a product carries that product's prefix; a company-scoped one does not. That is why this repository is hq and the mesh's are mesh-*. Seven repositories recorded — host, substrate, control, surfaces, sdk, lab, and this one. The lab gets its own: it ships to nobody, outlives any single tier, and drives virtualisation on a workstation, which nothing else does. Inside the host it would couple development tooling to a shipped component; inside the control plane the bootstrap scenario would depend on a tier that does not exist when it is needed. Tier 4 is deliberately not decided. Whether the catalogue is one repository, one per domain or one per application stays open from ADR 0015 and is blocked on research 005 — how many repositories hold domains cannot be answered before knowing what the domains are. mesh-catalog appears in the sketch and is not decided by this record. The cost is stated rather than glossed: seven release cadences where there is one, and cross-repository changes that used to be one commit.
01-RESEARCH
Investigations that have not yet hardened into design.
Structure
Each effort lives in NNN-descriptive-name/ and must contain 00-overview.md, carrying its
state in YAML frontmatter and a prose summary below it:
---
status: active | graduated | abandoned
initiated: YYYY-MM-DD
touches: [] # design docs, subsystems or areas the effort bears on
became: [] # required when status is terminal — what it turned into
---
The prose says what is being investigated, why, and what it touches. It does not restate the status — status lives in one place, and two places is one too many.
Further documents in the same folder hold the work itself: notes, evidence, option analyses, draft designs.
Lifecycle
| status | Meaning |
|---|---|
active |
Investigation in progress. |
graduated |
Checked against 00-META, decided in 02-DECISIONS/, and specified in 03-DESIGN — see became:. |
abandoned |
Stopped or superseded. Nothing is deleted. |
An effort graduates by producing a decision record and a 03-DESIGN entry. It is abandoned
in place — never deleted. What was rejected, and why, is the more expensive half to
rediscover.
Starting and closing efforts is playbook territory:
00-META/process/01-research.md and
02-graduation.md.
Rules
- Markdown only. Do not skip or reuse a sequence number.
- Evidence, not assertion. An effort that measured nothing has not finished.
- Research describes real observations but never identifies the mesh it observed. The shape of a finding survives anonymisation intact.