jschoubben 4adc656b54 Where Phase 3 actually stands
All three modules have manifests, all three parse, resolve and plan, and
none of them can start. Worth writing down before it reads as progress
or as failure, because it is neither.

The vocabulary held. Nothing in 3.1–3.3 needed a new shape — including
the mail system's several containers on a private network, which was the
one expected to break it. That was the question this phase was designed
to answer.

What did not hold was underneath: 022, now fixed, and 023, open. Both
are about credentials rather than about what a module can say.

The third fault was in the manifests, not the design: a secret declared
at a path named .env and read as one, when a sealed file holds a
password and nothing else. That is what a manifest checked only by a
parser buys, and it is why there are now two tests reading the manifests
on disk.

023 is the whole of what remains before the identity provider runs.
2026-09-01 02:56:54 +02:00
..
2026-09-01 02:56:54 +02:00

03-DESIGN

The authoritative specification. Implementation is built against what is written here.

Two layers

Folder What it is
00-as-is/ The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again.
01-to-be/ The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/.

They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.

When a to-be design ships, it does not move. Its as-is counterpart is written or updated, the to-be document's status becomes implemented, and both stand — one describing what runs, the other recording what was intended. Deleting the intention loses the reasoning, which is the expensive half.

Frontmatter

Every design document (not the READMEs) carries:

---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: []                 # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD      # date of the last status change, not of text edits
decisions: []            # 02-DECISIONS/ records this document rests on
---

For an as-is document, status: implemented is the normal state — it describes something that runs — and code: names where that implementation lives.

Status changes when implementation state changes, never because design text was edited. An implemented claim must be defensible from the owning repository's main branch, not from intent. If it cannot be checked, it is in-progress.

Cross-cutting views are generated from this frontmatter by the hq-status skill and never written to disk.

What belongs here

Functional analysis, architectural description, and specification — prose and diagrams only, no code. A manifest field may be named; a manifest may not be pasted. A document enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/ and the research that produced it is closed.

Subfolders are encouraged where a layer grows enough to need them.