Two corrections and one new decision, all from Jochen catching things. Pushed, not polled. I described updates as landing "on the next reconcile", which reads as polling and is not the design. A declaration arrives as a message on a link that is already open; the host applies it then. Polling over an existing connection would be slower to land AND constant traffic to learn nothing. The timer is for drift and nothing else, and it cannot be replaced by an event for a definitional reason: drift is change the mesh did not make -- somebody edited a managed file, a distribution upgrade replaced a config -- so nothing will ever publish a message about it. Only looking finds it. Separated the heartbeat from the reconcile timer, which I had been conflating. They point in opposite directions and answer different questions: the timer looks at the machine and asks whether it still matches; the heartbeat reports upward and is what makes silence mean something. A node with nothing to do sends nothing, and without a heartbeat that is indistinguishable from a node that stopped. 0059 -- a host that cannot start is rolled back by the service manager. I had left this open on the grounds that recovery meant the host judging its own health. That objection does not survive being asked properly: a keepalive is something else judging the host. The watchdog must be local, because nothing dials a node and a host that cannot start cannot report -- so it is the service manager, which is already there. The failure it prevents is sharper than "the node is down": a host that will not start looks exactly like a machine somebody switched off, which is the one condition this design has deliberately decided not to alarm on. So a bad release reaches every node, each goes quiet, and the mesh reports a fleet of sleeping laptops. Confirmed means started and completed one reconcile -- deliberately not "the link is up", or a laptop on a train would roll itself back. The rollback is a script shipped by the package, not a host subcommand, because a binary that will not start cannot be its own recovery. It rolls back once: a second failure means the machine is the problem, not the binary. Also refined the records checker, which produced a false positive: a proposed record may extend another proposed one, because decisions are drafted in chains and the alternative is marking things accepted to satisfy a check. An accepted document resting on a proposed record still fails, and that was verified. 0057, 0058 and 0059 are all proposed.
03-DESIGN
The authoritative specification. Implementation is built against what is written here.
Two layers
| Folder | What it is |
|---|---|
00-as-is/ |
The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again. |
01-to-be/ |
The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/. |
They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.
When a to-be design ships, it does not move. Its as-is counterpart is written or updated,
the to-be document's status becomes implemented, and both stand — one describing what runs,
the other recording what was intended. Deleting the intention loses the reasoning, which is
the expensive half.
Frontmatter
Every design document (not the READMEs) carries:
---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: [] # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD # date of the last status change, not of text edits
decisions: [] # 02-DECISIONS/ records this document rests on
---
For an as-is document, status: implemented is the normal state — it describes something that
runs — and code: names where that implementation lives.
Status changes when implementation state changes, never because design text was edited. An
implemented claim must be defensible from the owning repository's main branch, not from
intent. If it cannot be checked, it is in-progress.
Cross-cutting views are generated from this frontmatter by the hq-status skill and never
written to disk.
What belongs here
Functional analysis, architectural description, and specification — prose and diagrams
only, no code. A manifest field may be named; a manifest may not be pasted. A document
enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/
and the research that produced it is closed.
Subfolders are encouraged where a layer grows enough to need them.