HQ held only the to-be. Every reader had to already know the system the decisions were about, and an as-is claim had nowhere to live except inside an intention. Adds 02-DESIGN/00-as-is — eleven documents written from the implementation and the operational record, not from intent, including the parts nobody would choose again. The two existing designs move under 01-to-be. Layers are declared in frontmatter and never mix: a design that ships does not move, its as-is counterpart is written, and both stand. Back-fills adr/0001-0014 for decisions taken in implementation and never recorded — the broker, the module abstraction, the mesh database, managed files, provisioning, migrations, the workspace removal, failing loudly, the constitution, application placement, linking, the employee model, the artifact, the three silos. Each marked reconstructed, dated from the history, and citing the evidence it was recovered from. The two existing records renumber to 0015 and 0016 so the ledger runs oldest first; 0017 extends 0015 to modules outside the core, principle only — the domain list is deliberately not invented here. how-we-build.md becomes the source of the mesh constitution, with a sync playbook, so the enforced copy stops being the only one that is true. Process becomes explicit: five playbooks, eight thin skills that defer to them, a repository map, and AGENTS.md with CLAUDE.md as its include. The five Observations become 04-ISSUES 001-005 where they can be owned and closed. 006 is new and uncomfortable: HQ is not indexed into the knowledge base. That claim is what decision 27 rests on, it was never checked, and the README now says so instead of repeating it. Also corrects the ADR index into something generated, the "02-DESIGN is empty" claim, the VISION.md pointer that did not survive the repo split, and a note asserting the symlink rule was contradicted — it was a misreading; the rule forbids hand-made links, the installer links by design.
1.7 KiB
01-RESEARCH
Investigations that have not yet hardened into design.
Structure
Each effort lives in NNN-descriptive-name/ and must contain status.md, carrying its
state in YAML frontmatter and a prose summary below it:
---
status: ongoing | graduated | abandoned
initiated: YYYY-MM-DD
touches: [] # design docs, subsystems or areas the effort bears on
became: [] # required when status is terminal — what it turned into
---
The prose says what is being investigated, why, and what it touches. It does not restate the status — status lives in one place, and two places is one too many.
Further documents in the same folder hold the work itself: notes, evidence, option analyses, draft designs.
Lifecycle
| status | Meaning |
|---|---|
ongoing |
Investigation in progress. |
graduated |
Checked against 00-GENESIS, decided in adr/, and specified in 02-DESIGN — see became:. |
abandoned |
Stopped or superseded. Nothing is deleted. |
An effort graduates by producing a decision record and a 02-DESIGN entry. It is abandoned
in place — never deleted. What was rejected, and why, is the more expensive half to
rediscover.
Starting and closing efforts is playbook territory:
00-GENESIS/process/01-research.md and
02-graduation.md.
Rules
- Markdown only. Do not skip or reuse a sequence number.
- Evidence, not assertion. An effort that measured nothing has not finished.
- Research describes real observations but never identifies the mesh it observed. The shape of a finding survives anonymisation intact.