The predecessor's agent module was retired and its six files stayed on both workstations telling every session to use tools that no longer exist. This is its successor's design, revised during review on the operator's directions: the host is module-agnostic, the controller has no part, and a real licence manager hands out the correct licence in every situation. - ADR 0181 (reconstructed): the operator account is a node fact stated by the operator; the home is derived unless stated; a resource may be placed under it owned by the account; a node with no account refuses one. What the controller shipped on 2026-09-27 without a record. - ADR 0182: inside a home the module owns the directory and the files it places, writes into the tool's own files for its few keys, never declares a credential's content, and holds everything else as found; a predecessor's leftovers are the operator's to remove once. - ADR 0183: claude-licence-manager holds the mesh seat anthropic-licence-manager and owns the Anthropic licences, grants (encrypted with a key the vault made for it), bindings per touchpoint, usage and audit; one rotation source under a lease; a token travels module to module sealed to each node's module key on request/reply, never as an event; the agent module alone writes what the agent reads; the host delivers package and state and knows nothing else. A bounded exception to ADR 0113; dated mechanism notes on ADR 0050 and 0113. - To-be 36 (claude-code): the mesh's part of the agent's configuration lives in the agent's machine-wide managed directory, owned whole by the module and written by its code; nothing under the home but the credentials file of a subscription licence; the API-key licence through the key-helper; the console as a node-scoped provision (to-be 34 amended); MCP servers as settings with an mcp_configure tool; one agent directory per machine shared by every session. - To-be 39 (claude-licence-manager): store, the two licence kinds, keeping a grant alive, the hand-over, who gets which licence with the predecessor's fallbacks, adoption with the identity guard, the seat's verbs. Numbers taken across main and every open branch at the time of the merge; to-be 14, 29 and 34 carry dated notes; the glossary gains "operator account".
03-DESIGN
The authoritative specification. Implementation is built against what is written here.
Two layers
| Folder | What it is |
|---|---|
00-as-is/ |
The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again. |
01-to-be/ |
The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/. |
They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.
When a to-be design ships, it does not move. Its as-is counterpart is written or updated,
the to-be document's status becomes implemented, and both stand — one describing what runs,
the other recording what was intended. Deleting the intention loses the reasoning, which is
the expensive half.
Frontmatter
Every design document (not the READMEs) carries:
---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: [] # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD # date of the last status change, not of text edits
decisions: [] # 02-DECISIONS/ records this document rests on
---
For an as-is document, status: implemented is the normal state — it describes something that
runs — and code: names where that implementation lives.
Status changes when implementation state changes, never because design text was edited. An
implemented claim must be defensible from the owning repository's main branch, not from
intent. If it cannot be checked, it is in-progress.
Cross-cutting views are generated from this frontmatter by the hq-status skill and never
written to disk.
What belongs here
Functional analysis, architectural description, and specification — prose and diagrams
only, no code. A manifest field may be named; a manifest may not be pasted. A document
enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/
and the research that produced it is closed.
Subfolders are encouraged where a layer grows enough to need them.