Files
hq/03-DESIGN
jochen 805df3f81e ADR 0113 and to-be 27: rotation overlaps old and new credentials
Decided with the author. A credential is never changed in place: each consumer has two logins, both
derived by the mesh, and uses one at a time. An applier adds the new login beside the old through the
adapter's existing create, and confirms both work; only then are readers released to the new one and
restarted by derivation; only when every reader has confirmed is the old login retired through the
existing remove.

It closes the three cases review found in applier-first rotation: an offline reader keeps working on
the old login until it returns; a bus account's owner keeps its bus until it has moved; a provisioner
restarted mid-rotation is still delivered both values. Nobody is ever without a credential that works,
which replaces to-be 13's all-or-nothing rule with a stronger one.

No consumer module changes. The alternation is the provider loop's. A provider's adapter gains one duty,
giving both logins the same rights over the consumer's data — in postgres, membership of one role that
owns it. The mesh derives two logins per consumer, both within ADR 0049's limit, which 0113 now names
among what it amends. Every rule has a check: overlap, offline reader, bus account, restarted
provisioner, equal rights, login length, and confirmation only once the old login is gone.
2026-09-25 23:50:20 +02:00
..

03-DESIGN

The authoritative specification. Implementation is built against what is written here.

Two layers

Folder What it is
00-as-is/ The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again.
01-to-be/ The mesh being built toward. Every statement traceable to a record in 02-DECISIONS/.

They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.

When a to-be design ships, it does not move. Its as-is counterpart is written or updated, the to-be document's status becomes implemented, and both stand — one describing what runs, the other recording what was intended. Deleting the intention loses the reasoning, which is the expensive half.

Frontmatter

Every design document (not the READMEs) carries:

---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: []                 # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD      # date of the last status change, not of text edits
decisions: []            # 02-DECISIONS/ records this document rests on
---

For an as-is document, status: implemented is the normal state — it describes something that runs — and code: names where that implementation lives.

Status changes when implementation state changes, never because design text was edited. An implemented claim must be defensible from the owning repository's main branch, not from intent. If it cannot be checked, it is in-progress.

Cross-cutting views are generated from this frontmatter by the hq-status skill and never written to disk.

What belongs here

Functional analysis, architectural description, and specification — prose and diagrams only, no code. A manifest field may be named; a manifest may not be pasted. A document enters the to-be layer only after the decision behind it is recorded in 02-DECISIONS/ and the research that produced it is closed.

Subfolders are encouraged where a layer grows enough to need them.