papa-hq reads 01 research -> 03 decision -> 02 design. The order is a scar, not a choice: 02-DESIGN existed from its initial commit, and when adr/ was finally promoted on 2026-07-13 it took the next free number rather than its place in the sequence. By then design was too settled to renumber. hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and 02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks the process in the order it happens: research produces a decision, the decision authorises a design. 00-GENESIS becomes 00-META, matching papa's rename from the same restructure. Every path reference rewritten across documents, frontmatter, playbooks and skills. All links resolve; all 58 frontmatter blocks parse and their path fields still point at files that exist.
1.9 KiB
status, opened, located-in, fixed-by, amended-design
| status | opened | located-in | fixed-by | amended-design | |
|---|---|---|---|---|---|
| open | 2026-08-22 |
|
005 — The end-to-end pipeline harness has not built since the workspace was removed
Symptom
The repository's end-to-end pipeline test harness depends on a workspace that no longer exists. It has not been buildable since 2026-06-04. Nothing runs it, and nothing reports that nothing runs it.
Why this matters
The delivery pipeline is the mesh's most consequential machinery — every module reaches every node through it — and its only end-to-end coverage has been silently dead for over two and a half months.
That interval is not incidental. Several of the pipeline's most expensive defects landed inside it: packaging that was never actually split from build, migrations and provisioning scripts reading a source layout that no longer ships, selection files never packaged at all. Whether this harness would have caught any of them is unknown — which is itself the point. The coverage was assumed, not checked.
Evidence
- The workspace was removed by pull request #240 on 2026-06-04 (ADR 0007).
- The harness has not built since that date.
- Recorded in the knowledge base as a standing entry, not as a fixed incident.
Relationship to the lab
03-DESIGN/01-to-be/01-end-to-end-testing.md
designs end-to-end testing on a lab mesh, which would replace this harness rather than repair
it. That is a reason to decide its fate deliberately, not a reason to leave it broken and
unmentioned: until the lab exists, this is the coverage the pipeline is presumed to have.
Open questions
- Repair, or retire in favour of the lab? Leaving it in the repository unbuilt is the one option that keeps the false impression of coverage.
- Was anything relying on it, or had it already stopped running before the workspace removal?