Files
hq/04-ISSUES/005-pipeline-test-harness-unbuildable/00-report.md
T
jschoubben c0b35652d0 The numbering is the flow: decisions are 02, design is 03
papa-hq reads 01 research -> 03 decision -> 02 design. The order is a
scar, not a choice: 02-DESIGN existed from its initial commit, and when
adr/ was finally promoted on 2026-07-13 it took the next free number
rather than its place in the sequence. By then design was too settled to
renumber.

hal-hq was three commits old, so it is not. adr/ becomes 02-DECISIONS and
02-DESIGN becomes 03-DESIGN, and following the folder numbers now walks
the process in the order it happens: research produces a decision, the
decision authorises a design.

00-GENESIS becomes 00-META, matching papa's rename from the same
restructure.

Every path reference rewritten across documents, frontmatter, playbooks
and skills. All links resolve; all 58 frontmatter blocks parse and their
path fields still point at files that exist.
2026-08-23 18:05:11 +02:00

1.9 KiB

status, opened, located-in, fixed-by, amended-design
status opened located-in fixed-by amended-design
open 2026-08-22
hal

005 — The end-to-end pipeline harness has not built since the workspace was removed

Symptom

The repository's end-to-end pipeline test harness depends on a workspace that no longer exists. It has not been buildable since 2026-06-04. Nothing runs it, and nothing reports that nothing runs it.

Why this matters

The delivery pipeline is the mesh's most consequential machinery — every module reaches every node through it — and its only end-to-end coverage has been silently dead for over two and a half months.

That interval is not incidental. Several of the pipeline's most expensive defects landed inside it: packaging that was never actually split from build, migrations and provisioning scripts reading a source layout that no longer ships, selection files never packaged at all. Whether this harness would have caught any of them is unknown — which is itself the point. The coverage was assumed, not checked.

Evidence

  • The workspace was removed by pull request #240 on 2026-06-04 (ADR 0007).
  • The harness has not built since that date.
  • Recorded in the knowledge base as a standing entry, not as a fixed incident.

Relationship to the lab

03-DESIGN/01-to-be/01-end-to-end-testing.md designs end-to-end testing on a lab mesh, which would replace this harness rather than repair it. That is a reason to decide its fate deliberately, not a reason to leave it broken and unmentioned: until the lab exists, this is the coverage the pipeline is presumed to have.

Open questions

  • Repair, or retire in favour of the lab? Leaving it in the repository unbuilt is the one option that keeps the false impression of coverage.
  • Was anything relying on it, or had it already stopped running before the workspace removal?