Files
hq/03-DESIGN
jschoubben 95cf2052d2 Design 47 H2: H-A-685 to H-A-703, the review by architectural domain of H-A-634 to H-A-684
The one review round of 0cae7532..27e5c0d9 found lines that were wrong or left their builder a choice: a gate
ledger whose new operations would be refused until a recreate, lifetimes written before the bus allows them, a
snapshot store that drops its oldest silently, indexes nothing keeps, a history cap that fills at the measured rate,
an event hub that lets waiting events be given again, and token files whose pass could never match. Each is now an
amendment of the answer it corrects, within the record it follows, in a fifth answers file since the fourth is at
its bound; design 25 and the glossary say the snapshot store refuses when full, and the glossary gains the event hub.
2026-11-25 14:03:21 +01:00
..

03-DESIGN

The authoritative specification. Implementation is built against what is written here.

Two layers

Folder What it is
00-as-is/ The mesh that exists today. Shipped behaviour, described as it is — including behaviour nobody would choose again.
01-to-be/ The mesh being built toward. Every statement traceable to a decision record in the knowledge base (ADR 0290).

They are never mixed. A statement about the future does not belong in an as-is document, and an as-is document is never edited to describe an intention.

When a to-be design ships, it does not move. Its as-is counterpart is written or updated, the to-be document's status becomes implemented, and both stand — one describing what runs, the other recording what was intended. Deleting the intention loses the reasoning, which is the expensive half.

Frontmatter

Every design document (not the READMEs) carries:

---
layer: as-is | to-be
status: designed | in-progress | implemented | abandoned
code: []                 # owning code repo(s), from 00-META/repos.md
updated: YYYY-MM-DD      # date of the last status change, not of text edits
decisions: []            # the decision records this document rests on, each "ADR NNNN"
---

For an as-is document, status: implemented is the normal state — it describes something that runs — and code: names where that implementation lives.

Status changes when implementation state changes, never because design text was edited. An implemented claim must be defensible from the owning repository's main branch, not from intent. If it cannot be checked, it is in-progress.

Cross-cutting views are generated from this frontmatter by the hq-status skill and never written to disk.

What belongs here

Functional analysis, architectural description, and specification — prose and diagrams only, no code. A manifest field may be named; a manifest may not be pasted. A document enters the to-be layer only after the decision behind it is recorded in the knowledge base and the research that produced it is closed.

Subfolders are encouraged where a layer grows enough to need them.